| Location: | Utah |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Sep 1, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-07 |
| Publication URL: | To access bid details, please log in. |
Project Description: The scope of this project is to provide all the labor, materials, tools and equipment necessary to construct the Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project, complete as described in the plans and specifications. The project generally includes the following: to remove sediment and debris in the vicinity of this pedestrian bridge, excavate sediment deposits within the main and tributary channels and in the overbank areas to protect the pedestrian bridge and existing trail from erosion hazards, install a concrete apron on the channel bottom and banks to protect the bridge abutments of the proposed bridge from erosion hazards, install riprap on the downstream side of the three existing culverts, and provide erosion protection along the Pack Creek channel in the area

With GovernmentContracts, you can:
...oil, radiator fluid (including absorbent material), and any other vehicular debris or fluid...
State Government of Utah
Bid Due: 12/31/2026
...of all oil, radiator fluid (including absorbent material), and any other vehicular debris ...
State Government of Utah
Bid Due: 12/31/2026
...Canal Mill Creek crossing including a Debris Rack Structure, new box culvert canal ...
State Government of Utah
Bid Due: 9/23/2026