REQUEST FOR PROPOSALS (RFP)
Hilton Head Public Service District
Ribaut Island Water Main Replacement Project
Hilton Head Island, South Carolina
August 3, 2026
1. INVITATION TO SUBMIT PROPOSALS
Hilton Head Public Service District (HHPSD) invites qualified construction contractors, design-build teams, and
other qualified project delivery entities to submit proposals for the replacement of the existing 10-inch potable
water transmission main serving Ribaut Island within Hilton Head Plantation, Hilton Head Island, South
Carolina.
The existing water main consists of a 10-inch PVC pipeline suspended from an existing bridge crossing. HHPSD
intends to replace the existing crossing with a new 10-inch High Density Polyethylene (HDPE) water main
installed via Horizontal Directional Drilling (HDD) beneath the waterway. The project shall include all
engineering, permitting, environmental coordination, utility coordination, construction, testing,
commissioning, and final acceptance services necessary to provide a complete and operational water main
crossing.
HHPSD is seeking respondents to assemble progressive design-build teams that best achieve project
objectives while minimizing schedule, risk, and disruption to customers.
2. OWNER
Hilton Head Public Service District
21 Oak Park Drive
Hilton Head Island, SC 29926
Project Contact:
Bill Davis, Operations Manager
Email: bdavis@hhpsd.com
All communications regarding this RFP shall be directed to the designated HHPSD representative.
1
3. PROJECT BACKGROUND
HHPSD owns and operates the potable water distribution system serving Hilton Head Island. Ribaut Island is
currently served through a 10-inch PVC water main that is attached to and suspended beneath an existing
bridge crossing. The existing installation presents long-term operational, maintenance, vulnerability, and
resiliency concerns.
HHPSD desires to replace the existing crossing with a new 10-inch HDPE water transmission main installed
beneath the waterway using Horizontal Directional Drilling techniques. The new installation shall provide a
resilient, long-term utility crossing designed to reduce exposure to physical damage, environmental impacts,
and maintenance requirements.
The existing crossing is located between mainland Hilton Head Plantation infrastructure and Ribaut Island.
4. PROJECT OBJECTIVES
The selected team shall provide a complete project solution that:
1. Replaces the existing 10-inch PVC bridge-mounted water main.
2. Installs a new 10-inch HDPE water main via HDD beneath the waterway.
3. Minimizes disruption to water service and surrounding property owners.
4. Obtains all required permits and regulatory approvals.
5. Provides a durable and resilient crossing with a minimum design life of 75 years.
6. Minimizes long-term operational and maintenance requirements.
7. Maintains water quality and hydraulic performance.
8. Delivers the project safely, efficiently, and cost effectively.
5. SCOPE OF SERVICES
The selected Contractor/Design-Builder shall be responsible for furnishing all labor, supervision, professional
services, materials, equipment, permits, and incidentals necessary for a complete turnkey project.
The scope shall include, but not necessarily be limited to, the following:
A. Project Development
• Review existing conditions.
• Perform field investigations.
• Conduct utility locating and subsurface utility investigations.
• Evaluate geotechnical conditions.
2
• Perform survey as necessary.
• Develop project delivery strategy.
B. Engineering Services
The Contractor shall provide or subcontract all professional engineering services required for completion of the
project, including:
• Civil engineering.
• Utility design.
• Geotechnical engineering.
• Structural engineering as required.
• Environmental services.
• HDD engineering and pull calculations.
• Construction documents.
• Permit drawings and applications.
• Record drawings.
For the Progressive Design-Build approach, the Contractor shall identify the design partner and describe team
roles and responsibilities.
C. Permitting and Regulatory Coordination
The Contractor shall obtain all permits necessary for project completion, including coordination with
applicable agencies, utility owners, and property owners.
Potential permitting agencies may include, but are not limited to:
• South Carolina Department of Environmental Services, and associated offices (e.g. S.C. DES Office of
Ocean and Coastal Resource Management).
• South Carolina Department of Transportation.
• U.S. Army Corps of Engineers.
• South Carolina Department of Natural Resources.
• Beaufort County.
• Town of Hilton Head Island.
• Hilton Head Plantation Property Owners Association.
3
• Any other authority having jurisdiction.
HHPSD expects the Contractor to manage the permitting process from initiation through permit issuance.
D. Horizontal Directional Drill Installation
The Contractor shall design and construct an HDD crossing that includes:
• New 10-inch HDPE potable water main.
• Appropriate pipe material selection and pressure class.
• HDD profile development.
• Entry and exit pits.
• Drilling operations.
• Pipe installation.
• Pipe fusion and quality assurance.
• Restoration of disturbed areas.
E. Water Main Improvements
The project may include:
• Connection to existing distribution system.
• Isolation valves.
• Air release/vacuum relief assemblies as required.
• Blowoff facilities as required.
• Temporary bypass systems.
• Abandonment or removal of existing facilities.
• Cathodic protection or tracer wire systems as appropriate.
F. Testing and Commissioning
The Contractor shall perform:
• Pressure testing.
• Leakage testing.
• Disinfection.
• Bacteriological testing.
4
• System startup.
• Operator training.
• Final commissioning.
6. PROJECT DELIVERY
Respondents may propose:
Progressive Design-Build
A two-phase approach consisting of:
Phase 1
• Preliminary engineering and alternative analysis
• Risk assessment
• Field and Geotechnical investigation
• Cost development with Guaranteed Maximum Price (GMP)
• Permit matrix and permit acquisition timeline
• Guaranteed construction approach with detailed schedule
Phase 2
HHPSD will decide at the end of Phase 1, if the project will proceed into Phase 2.
• Final design, permit applications, and permit approvals
• Construction
• Testing
• Commissioning
7. CONTRACTOR QUALIFICATIONS
The proposing entity shall demonstrate:
• Experience with HDD installation of water transmission mains.
• Experience with HDPE pipe installations of similar size.
• Experience performing work in environmentally sensitive or regulated areas.
• Successful completion of comparable utility crossings within the last ten years.
• Financial capability to complete the project.
5