Project ID: 26-014QP
Title: 26-014QP-FHWA AAC East Marginal Way Construction Management Services (FHWA)
Addenda: 0
Release Date: 7/15/2026
Due Date: 8/12/2026
Project Description:
The City of Seattle, through Seattle Department of Transportation (SDOT), requests Statements of Qualifications, with the goal of contracting for the following key staff:
1 full time Resident Engineer, 2 full time Construction Inspectors, ¾ time Change Order/Scheduling specialist, ½ time Office Engineer, ½ Doc Control/Contract Admin, and 1 part time Outreach support to provide Construction Management (CM) services on the AAC East Marginal Way project, as part of the overall CM team managing the construction contract for the project.
AAC East Marginal Way
The AAC East Marginal Way Project includes pavement preservation work (a 2" asphalt mill & overlay) on the southern portion of E Marginal Wy S. This pavement preservation project (a mill & overlay) is intended to extend the life of the existing pavement structure by 10 to 20 years. The project was awarded a $6.87M PSRC preservation grant. Scope of AAC work is typical of completed projects. Base repairs, ADA curb ramps, Stormwater Code mandated drainage improvements, striping & signal loop restoration, and the final surfacing course will all covered by AAC. Additional improvements and funding for those will be identified during the Complete Streets planning process.
Work will be accomplished in accordance with the FHWA reviewed project Plans and Specifications advertised for construction.
For additional project information, please see the project website:
E Marginal Way S Paving and Safety Improvements - Transportation | seattle.gov
The successful initiation and completion of this project are contingent on receiving federal funding.
The Seattle Department of Transportation intends to execute the consultant construction management contract in December 2026, and the contract is expected to be completed in July 2028. Completion date may be extended if additional phases are added. Construction closeout is anticipated to last six (6) months.
The City anticipates possibly awarding an initial contract amount of $2,000,000 and an initial duration of 2 years. The initial contract value and duration may be increased in varying contract dollar amounts and time. This project is anticipated to be federally funded in part through FHWA, administered in part through the Washington State Department of Transportation, and may be funded through other federal funds or Agencies.

With GovernmentContracts, you can:
...),Demolition/Building Removal/Hauling/Salvage,Drainage,Drainage, Dredging, Ditches and Canals,Erosion..., Drainage, Dredging, Ditches and Canals, Fittings and ...
City of Wenatchee
Bid Due: 9/16/2026
..., asphalt paving, curbs, sidewalks including ramps, drainage improvements, a traffic signal, fiber ...
City of Vancouver
Bid Due: 2/02/2045
..., and storm drainage components, and site restoration including grading, gravel surfacing, fencing, ...
City of Seattle
Bid Due: 9/16/2026
...paving, curbs, sidewalks including ramps, drainage improvements, a traffic signal, fiber optic...
City of Vancouver
Bid Due: 2/02/2045