RFP for Professional Eng. Svcs. for Bridge Crossings Project J-2700

Location: California
Posted: Oct 21, 2026
Due: Nov 12, 2026
Agency: Santa Fe Irrigation District
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: RFP for Professional Eng. Svcs. for Bridge Crossings Project J-2700
Category: Capital Improvement Projects
Status: Open
Additional Status Information: See
Description:

REQUEST FOR PROPOSALS

FOR

PROFESSIONAL ENGINEERING DESIGN SERVICES FOR THE REPLACEMENT/REFURBISHMENT OF TWO

ABOVE GROUND PIPELINE BRIDGE CROSSINGS PROJECT

1.0 INTRODUCTION

1.1  Purpose

The Santa Fe Irrigation District (SFID) is seeking proposals from qualified Engineering firms to provide Professional Engineering Design Services for the Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Project J-2700 (the Project).

SFID is a public agency existing and operating pursuant to the Irrigation District Law, California Water Code Section 20500 et seq. This Request for Proposals (RFP) describes the Project, the required scope of services, the consultant selection process, and the minimum information that must be included in the proposal. Failure to submit information in accordance with the RFP requirements and procedures may be cause for disqualification. SFID reserves the right to waive minor proposal deviations or omissions at its sole discretion.

The lengths of the two above ground pipeline bridge crossings are relatively short. One is a 12-inch diameter welded steel pipeline approximately 135 feet long, installed in 1977. The other is an 18-inch diameter welded steel pipeline approximately 400 feet long, installed in 1982.  The objectives of the project are to:

  • Determine whether the existing steel pipelines, couplings, and pipe supports are structurally adequate considering current seismic design standards;
  • Estimate the remaining useful life of the two above ground steel pipeline bridge crossings, and associated couplings and pipe supports;
  • Determine the refurbishment and/or replacement improvements required to assure reliable performance during a seismic event and/or maximize the useful life of the existing infrastructure;
  • Identify all permitting requirements, including CEQA compliance, to accommodate implementation of the identified improvements; and,
  • Develop a Preliminary Design Report that includes preliminary level plans, technical specifications, permitting requirements, construction schedule, and construction cost estimate for the identified refurbishment and/or replacement improvements.

The engineering firm should perform the general tasks as described in the Scope of Work. SFID intends to select the most qualified engineering firm for the project. Proposals will be evaluated by SFID’s Screening and Selection Committee on the basis of the following criteria:

1. Project Understanding and Approach

2. Scope of Work and Reasonableness of the Schedule of Services

3. Qualifications of Key Personnel (team) and Relevant Experience

4. Overall Clarity of Proposal/Compliance with the RFP

5. Cost of Proposal

Please refer to Section 4 of the RFP for more detailed scope requirements.

1.2  E-Notification Information

Notifications regarding amendments or other information regarding this RFP will be automatically distributed to firms that sign up through SFID’s website at Notify Me • Santa Fe Irrigation District, CA • CivicEngage (sfidwater.org) for the Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Project, at no cost. A link to the RFP can be found on the SFID website at www.sfidwater.org and by selecting “Bids/Projects” at the top of the page. Select “Listing of Capital Improvements Projects” and the Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Project. Please note that each consultant will be required to acknowledge receipt of the addenda in the proposal.

1.3  Due Date and Delivery

The electronic proposal shall be marked “Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Project” and must be received via email at

For security reasons, you must enable JavaScript to view this E-mail address. on or before:

Time: 2:00 p.m.

Date: Thursday, December 3, 2026

Proposals received after this time will not be accepted.  Faxed proposals will not be accepted.

1.4 Questions Concerning Proposals

Requests for interpretation, clarification and/or explanation regarding any aspect of this RFP must be received in writing, via email, by SFID no later than 12:00 P.M., Pacific Standard Time (PST), Thursday, November 12, 2026. Questions must be sent to the attention of Hanna Dodd Gabin, Senior Civil Engineer, via e-mail to

For security reasons, you must enable JavaScript to view this E-mail address..  Questions submitted via e-mail shall contain the following title in the Subject line: Replacement/Refurbishment of Two Above Ground Bridge Crossings — RFP Question.

Questions will not be accepted by telephone.  Any questions received after this date and time may not receive a response.  Written responses to questions will be sent to all proposers.

1.5  Pre-Proposal Meeting

A non-mandatory pre-proposal meeting will be held on Thursday, November 5, 2026, at 2:30 p.m. at the Santa Fe Irrigation District Office located at 5920 Linea del Cielo, Rancho Santa Fe, 92067. Proposers are strongly encouraged to attend.

1.6  Project Schedule

The Project shall be completed within approximately 20 weeks after notice to proceed. The solicitation, receipt and evaluation of proposals, the selection of the provider of Professional Services and the completion of the plan shall correspond to the following schedule:

* Following the SFID Board of Directors approval

** Tentative dates: Includes estimated time required for District Staff reviews. Actual dates will be based on the Awarded Consultant’s proposal.

(Note: dates are subject to change)

Publication Date/Time:
10/21/2026 7:00 AM
Closing Date/Time:
Open Until Contracted
Submittal Information:
See
Bid Opening Information:
December 3, 2026 @ 2:00 PM
Pre-bid Meeting:
November 5, 2026 @ 2:30 P.M.
Contact Person:
Hanna Dodd Gabin, Senior Civil Engineer
hdodd@sfidwater.org
Download Available:
See
Plan & Spec Available:
See "Related Documents" tab
Business Hours:
8:00 a.m. - 4:00 p.m.
Plan Holders List:
See "Related Documents" tab
Related Documents:

Attachment Preview

REQUEST FOR PROPOSALS
(RFP)
Professional Engineering Design Services
For The
REPLACEMENT/REFURBISHMENT OF TWO ABOVE
GROUND PIPELINE BRIDGE CROSSINGS PROJECT
CONTRACT NO. J-2700
Santa Fe Irrigation District
5920 Linea del Cielo
Rancho Santa Fe, CA 92057
Issue Date: October 21, 2026
Proposals Due: Before 2:00 PM on December 3, 2026

TABLE OF CONTENTS
1. INTRODUCTION..............................................................................................................4
1.1 Purpose................................................................................................................................4
1.2 E-Notification Information ...............................................................................................5
1.3 Due Date and Delivery .......................................................................................................5
1.4 Questions Concerning Proposals ......................................................................................5
1.5 Pre-Proposal Meeting ........................................................................................................6
1.6 Project Schedule .................................................................................................................6
2. BACKGROUND INFORMATION .................................................................................7
3. PROJECT DESCRIPTION ..............................................................................................7
4. SCOPE OF WORK..........................................................................................................15
5. CONFLICT OF INTEREST ...........................................................................................20
6. ACKNOWLEDGEMENT OF CONTRACT AGREEMENT .....................................20
7. PROPOSAL FORMAT ...................................................................................................21
8. EVALUATION CRITERIA ...........................................................................................24
9. CONSULTANT SELECTION PROCESS ....................................................................24
10. CONTRACT NEGOTIATION.......................................................................................24
11. PUBLIC DISCLOSURE .................................................................................................25
12. SPECIAL CONDITIONS ...............................................................................................25
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 2 of 26 October 2026

ATTACHMENTS
BACKGROUND DOCUMENTS ...................................................................................... A
SFID STANDARD PROFESSIONAL SERVICES AGREEMENT ................................ B
COST ESTIMATE TEMPLATE ....................................................................................... C
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 3 of 26 October 2026

REQUEST FOR PROPOSALS
FOR
PROFESSIONAL ENGINEERING DESIGN SERVICES
FOR THE
REPLACEMENT/REFURBISHMENT OF TWO ABOVE GROUND PIPELINE BRIDGE
CROSSINGS PROJECT
1.0 INTRODUCTION
1.1. Purpose
The Santa Fe Irrigation District (SFID) is seeking proposals from qualified Engineering firms to
provide Professional Engineering Design Services for the Replacement/Refurbishment of
Two Above Ground Pipeline Bridge Crossings Project J-2700 (The Project).
SFID is a public agency existing and operating pursuant to the Irrigation District Law,
California Water Code Section 20500 et seq. This Request for Proposals (RFP) describes The
Project, the required scope of services, the consultant selection process, and the minimum
information that must be included in the proposal. Failure to submit information in accordance
with the RFP requirements and procedures may be cause for disqualification. SFID reserves the
right to waive minor proposal deviations or omissions at its sole discretion.
The lengths of the two above ground pipeline bridge crossings are relatively short. One is a 12-
inch diameter welded steel pipeline approximately 135 feet long, installed in 1977. The other is
an 18-inch diameter welded steel pipeline approximately 400 feet long, installed in 1982. The
objectives of the project are to:
* determine whether the existing steel pipelines, couplings, and pipe supports are
structurally adequate considering current seismic design standards;
* estimate the remaining useful life of the two above ground steel pipeline bridge
crossings, and associated couplings and pipe supports;
* determine the refurbishment and/or replacement improvements required to assure
reliable performance during a seismic event and/or maximize the useful life of the
existing infrastructure;
* identify all permitting requirements, including CEQA compliance, to accommodate
implementation of the identified improvements; and
* develop a Preliminary Design Report that includes preliminary level plans, technical
specifications, permitting requirements, construction schedule, and construction cost
estimate for the identified refurbishment and/or replacement improvements.
The Engineering firm should perform the general tasks as described in the Scope of Work. SFID
intends to select the most qualified Engineering firm for the project. Proposal will be evaluated
by SFID's Screening and Selection Committee on the basis of the following criteria:
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 4 of 26 October 2026

1. Project Understanding and Approach
2. Scope of Work and Reasonableness of the Schedule of Services
3. Qualifications of Key Personnel (team) and Relevant Experience
4. Overall Clarity of Proposal/Compliance with the RFP
5. Cost of Proposal
Please refer to Section 4 below for more detailed scope requirements.
Failure to submit information in accordance with this RFP's requirements and procedures may be
cause for disqualification.
1.2. E-Notification Information
Notifications regarding amendments or other information regarding this RFP will be
automatically distributed via firms who sign up through SFID's website at Notify Me * Santa Fe
Irrigation District, CA * CivicEngage (sfidwater.org) for the Replacement/Refurbishment of
Two Above Ground Pipeline Bridge Crossings Project, at no cost. A link to the RFP can be
found on the SFID website at www.sfidwater.org and selecting "Bids/Projects" at the top of the
page. Select "Listing of Capital Improvements Projects" and the Replacement/Refurbishment
of Two Above Ground Pipeline Bridge Crossings Project. Please note that each consultant
will be required to acknowledge receipt of Addenda in the proposal.
1.3. Due Date and Delivery
The electronic proposal shall be marked "Replacement/Refurbishment of Two Above Ground
Pipeline Bridge Crossings Project" and must be received via email to hdodd@sfidwater.org on
or before:
Time: 2:00 p.m.
Date: Thursday, December 3, 2026
Proposals received after this time will not be accepted. Faxed proposals will not be accepted.
1.4. Questions Concerning Proposals
Requests for interpretation, clarification and/or explanation regarding any aspect of this RFP
must be received in writing, via email, by SFID no later than 12:00 P.M., Pacific Standard Time
(PST), Thursday, November 12, 2026. Questions must be sent to the attention of Hanna Dodd
Gabin, Senior Civil Engineer, via e-mail to hdodd@sfidwater.org. Questions submitted via e-
mail shall contain the following title in the Subject line Replacement/Refurbishment of Two
Above Ground Bridge Crossings - RFP Question.
Questions will not be accepted by telephone. Any questions received after this date may not
receive a response. Written responses to questions will be sent to all Proposers.
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 5 of 26 October 2026

Release of RFP: October 21, 2026
Pre-Proposal Meeting (non-mandatory): November 5, 2026
Question Deadline: November 12, 2026
Proposal Due Date: December 3, 2026
Proposer Negotiations (if required): December 16, 2026
Recommend Contract Award to Water Resources Committee: January 7, 2027
Recommend Contract Award to Board of Directors: January 21, 2027
Notice To Proceed * February 1, 2027
Project Kickoff * February 2, 2027
Determination of Required Improvements Memorandum** (7 weeks after NTP) March 23, 2027
Draft Preliminary Design Report ** (15 weeks after NTP) May 18, 2027
Final Preliminary Design Report ** (20 Weeks after NTP) June 22, 2027

1.5. Pre-Proposal Meeting
A non-mandatory pre-proposal meeting will be held on Thursday November 5, 2026, at 2:30
p.m. at the Santa Fe Irrigation District Office located at 5920 Linea Del Cielo, Rancho Santa Fe,
92067. Proposers are strongly encouraged to attend.
1.6. Project Schedule
The Project shall be completed within approximately 20 weeks after notice to proceed. The
solicitation, receipt and evaluation of proposals and the selection of the provider of Professional
Services and the completion of the plan shall correspond to the following schedule:
Release of RFP: October 21, 2026
Pre-Proposal Meeting (non-mandatory): November 5, 2026
Question Deadline: November 12, 2026
Proposal Due Date: December 3, 2026
Proposer Negotiations (if required): December 16, 2026
Recommend Contract Award to Water
January 7, 2027
Resources Committee:
Recommend Contract Award to Board of
January 21, 2027
Directors:
Notice To Proceed * February 1, 2027
Project Kickoff *
February 2, 2027
Determination of Required
Improvements Memorandum** March 23, 2027
(7 weeks after NTP)
Draft Preliminary Design Report **
May 18, 2027
(15 weeks after NTP)
Final Preliminary Design Report **
June 22, 2027
(20 Weeks after NTP)
* Following the SFID Board of Directors Approval
** Tentative Dates: Includes estimated time required for District Staff reviews. Actual
Dates will be based on the Awarded Consultant's proposal.
(Note: dates are subject to change)
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 6 of 26 October 2026

2.0 BACKGROUND INFORMATION
Santa Fe Irrigation District (SFID/District) was established January 26, 1923, and is a special
public agency, organized under the laws of the State of California to provide water services to
residents and businesses within a 16 square mile area within communities of Rancho Santa Fe,
Fairbanks Ranch, the City of Solana Beach, and areas in the northern portion of the City of Del
Mar and all located within San Diego County. The approximate population served by SFID is
20,000 people. SFID provides potable water service for domestic, commercial, outdoor
irrigation, and agricultural demands. SFID owns, operates, and maintains pipelines, pressure-
reducing stations, water services, meters, and other facilities required to distribute water to each
of its customers. The distribution system includes over 150 miles of transmission and distribution
pipelines separated into 12 pressure zones created by 31 pressure-reducing stations (PRSs) and
includes one six-million-gallon Larrick storage tank and pump station.
SFID's goal is to systematically replace aging infrastructure in-order to maintain safe, reliable,
and efficient operations. In 2021, SFID completed a Water System and Capital Improvement
Program Master Plan Update (2021 Master Plan) to evaluate the integrity of the distribution
system, project the useful life of each asset, and identify projects for the 10-year Capital
Improvement Program (CIP). In 2026, the "2026 Capital Improvement Program Update
Memorandum" was developed as a supplemental to the 2021 Master Plan. The 2026 CIP Update
Memorandum updated the 10-Year CIP and associated project descriptions.
The need to replace or refurbish the two above ground pipeline bridge crossings included in this
project was originally identified in the 2021 Master Plan. As part of the 2026 CIP Update, the
requirements for the project were further refined and a modified project was developed and
included in the 2026 CIP Update Memorandum as the "Replace/Refurbish Two Pipeline Bridge
Crossings Project". A project description summary was included in the 2026 CIP Update
Memorandum. For planning level cost estimating purposes, the 2026 CIP assumed one of the
crossings would be replaced and the other would be refurbished. This was just a planning level
assumption and was not based on any detailed analysis. The work identified under this RFP will
determine the actual refurbishment and/or replacement requirements for each above ground
pipeline bridge crossing.
General information regarding SFID's service area and distribution system can be found in the
2021 Master Plan located on SFID's website. A copy of the 2026 CIP Update Memorandum,
which includes SFID's updated 10-Year CIP, and associated Replace/Refurbish Two Pipeline
Bridge Crossing Project Description Summary Sheet, is included as an attachment to this
Request for Proposals.
3.0 PROJECT DESCRIPTION
3.1 Location of the Bridge Crossings: SFID's potable water distribution system includes two
above ground pipeline bridge crossings. Figure 1 shows the boundaries of SFID's service area
and the location of the two bridge crossings. One of the crossings is located within the western
portion of SFID's service area on a bridge along Via de la Valle that crosses railroad tracks. The
bridge runs east to west along the border of the Cities of Del Mar and Solana Beach. SFID's
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 7 of 26 October 2026

pipeline is located on the north side of the bridge within City of Solana Beach's right-of-way.
The second crossing is located within the southeastern portion of SFID's service area, on a
bridge along Via de Santa Fe in the vicinity of Calzada Del Bosque. The bridge runs north and
south, crosses over a major drainage area, and connects the communities of Fairbanks Ranch and
Rancho Santa Fe. SFID's above ground pipeline is located on the eastern side of the bridge. The
bridge is located within an unincorporated area of the County of San Diego.
Figure 1
SFID Service Area and Subject Above Ground Pipeline Bridge Crossing Locations
3.2 Via de la Valle Above Ground Pipeline Crossing
Figure 2 provides a photo of the Via de la Valle above ground pipeline bridge crossing looking
west to east. The above ground 12-inch diameter, cement mortar lined. welded steel pipeline is
approximately 135 feet long. Pipe supports are secured to the bridge at approximately 12-foot
intervals along the pipeline.
The Via de la Valle crossing was constructed in 1977. A copy of the as-built drawings are
provided as an attachment to the RFP. Also attached are schematic "SFID Atlas Map" drawings
of the crossing including upstream and downstream pipelines and valves. Per the as-built
drawings, the 12-inch welded steel pipeline connects underground with 12-inch Asbestos
Cement Pipeline (ACP) within SFID's 202 Pressure Zone. The upstream and downstream
pipeline connection points were encased in concrete. The invert elevation of the pipeline at the
lowest connection point is approximately 58.5 feet. Therefore, the pressure within the welded
steel pipeline is approximately 62 psi. The as-builts drawings indicate that a sleeve coupling was
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 8 of 26 October 2026

installed on the welded steel pipeline. However, the existing pipeline does not include a sleeve
coupling. It does not appear the sleeve coupling was ever installed. There are no flexible
couplings on the existing Via de la Valle welded steel pipeline crossing.
Figure 2
Via de La Valle Above Ground Pipeline Crossing
Per the as-built drawings an air/vacuum release valve was installed on the eastern side of the
crossing. However, the air/vacuum release valve is no longer operational. Figure 3 provides a
photo of the existing air/vacuum release valve.
Figure 3
Existing Non-operational Air/Vacuum Release Valve On East End Of Crossing
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 9 of 26 October 2026

There has never been any recorded leakage or failure of the Via de la Valle above ground
pipeline crossing. However, as shown on Figure 4, at some time in the past a pipe saddle was
installed at the western end of the crossing. The purpose of this saddle is currently unknown. It
is possible that at some point in the past a perceived potential problem area was identified, and
the saddle was placed over the area of concern.
Figure 4
Pipe Saddle Located on West End Of The Crossing
The photos on Figures 2, 3, and 4 show that the exterior coating on the pipeline and pipe
supports has deteriorated and there is rust accumulation on the pipeline, air/vacuum release
valve, and supports. It is not known whether the current level deterioration on the exterior of the
pipe, appurtenances, and supports is superficial, or an indication of something more significant.
There was never any cathodic protection installed on the welded steel pipeline. However, it is not
known if cathodic protection would add any value. In addition, considering current design
standards it is not known if the existing pipeline and supports provide a reasonable level of
reliability in the event of an earthquake.
The above ground pipeline crossing is located on the north side of the bridge within the City of
Solana Beach's right-of-way. The bridge crosses over railroad tracks. The bridge and railroad
tracks are within the North County Transit District (NCTD) right of way. Any work in the
vicinity of the railroad tracts requires authorization from the NCTD. In addition to the train
traffic below, the bridge carries a high level of vehicle traffic throughout the year. The volume
of vehicular traffic increases substantially during summer months.
In addition to SFID, other utilities use the bridge to cross the railroad tracks. In 2016, the City of
Solana Beach and City of Del Mar constructed a 6-inch fusible PVC recycled water pipeline,
within an 8-inch steel casing, above SFID's welded steel pipeline. The recycled water line is
owned by the San Elijo Joint Powers Authority. A photo of the recycled water pipeline is shown
in Figure 5. The recycled water pipeline crossing was part of a larger recycled water pipeline
project implemented by the two Cities. A copy of the recycled water line drawings is attached to
Replacement/Refurbishment of Two Above Ground Pipeline Bridge Crossings Page 10 of 26 October 2026

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow UPDATE Request for Bids for Food Trucks at Rodeo Beach within Golden

INTERIOR, DEPARTMENT OF THE

Bid Due: 12/31/2026

GFO-26-302 - Food Production Investment Program 2026 Solicitation Type Grant Funding Opportunity Solicitation

California Energy Commission

Bid Due: 12/17/2026

Opportunity ID 224081 Organization City of Los Angeles Department Transportation Stage Open Contact

City of Los Angeles

Bid Due: 12/10/2026

Project ID: Title: 2026 Sewer Rehabilitation Project Addenda: 0 Release Date: 9/17/2026 Due

City of American Canyon

Bid Due: 1/12/2027

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.