| Location: | Oklahoma |
|---|---|
| Posted: | Sep 18, 2025 |
| Due: | Oct 3, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W912BV25QA026 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Arcadia Lake Gate Tower Elevator Rehab. The US ARMY CORPS OF ENGINEERS is seeking quotes for a total turn-key contract of Gate Tower Elevator Rehab at Arcadia Lake, Oklahoma. Work includes but is not limited to: install new Smartrise C4 nonproprietary elevator controller with solid state drive and VVVF control; install new wiring throughout the system; retain car and lobby fixtures, refurbish as needed; install new hoistway limit switches where required; replace GAL car door components as needed (rollers, Gibbs, acentric, etc.); clean and refurbish hoist way interlocks as needed; retain car and hoist way doors; new car top inspection station; retain geared machine and motor (rebuild 3 phase drive motor optional); install new push/pull stop switch in the pit; replace corrosion affected conduit and components in hoist way; new pit ladder; other components to be retained: the guide rails, pit ladder, existing entrance frames, platform and car frame; and permit and inspection required by the State of Oklahoma, City of Oklahoma City or a third-party inspection firm. THE ONLY AUTHORIZED TRANSMISSION METHODS FOR SUBMITTING QUOTES IN RESPONSE TO THIS SOLICITATION IS THROUGH THE PIEE SOLICITATION MODULE WEBSITE AT: https://piee.eb.mil. NO OTHER TRANSMISSION METHODS (FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Prospective Offerors must also be registered with the System for Award Management (SAM) at https://sam.gov/ in order to participate in this procurement. The POP is estimated for 180 calendar days after the Notice to Proceed. Amendment No. 0001 is hereby issued to schedule a second site visit at 1:00 PM Central Time on Tuesday, 23 September 2025. Due dates for responses are extended to 3:00 PM Central Time, 03 October 2025.
| Aug 12, 2025 | [Presolicitation (Original)] Arcadia Lake Gate Tower Elevator Rehab |
| Sep 5, 2025 | [Solicitation (Original)] Arcadia Lake Gate Tower Elevator Rehab |
| Sep 19, 2025 | [Solicitation (Updated)] Arcadia Lake Gate Tower Elevator Rehab |
| Sep 26, 2025 | [Solicitation (Updated)] Arcadia Lake Gate Tower Elevator Rehab |

With GovernmentContracts, you can:
Follow FOMS SOFTWARE DEVELOPMENT Active Contract Opportunity Notice ID 6973GH-27-R-FOMSSOFTWAREDEVELOPMENT Related Notice Department/Ind.
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/06/2026
Follow WWYK240015 - Rehab Tanks 62501E & 62501W Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 11/05/2026
Public Works Phase II - Crossland Construction (CMR) Moore Public Works Phase II
City of Moore
Bid Due: 11/12/2026
Procurement #165012 Title Stilwell Ani Art Center- Signage Install Status Active OpenDate 10/29/2026
Cherokee Nation
Bid Due: 11/06/2026