| Location: | Alaska |
|---|---|
| Posted: | Sep 17, 2025 |
| Due: | Sep 18, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA500425Q0067 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
-------------------------------------------------------------------------
Amendment made 9/17/25
Removed:
JA_brandname_BobcatLRS_co signed.pdf
JA_brandname_BobcatOSS_co signed.pdf
added:
JA-Bobcat LRS-OSS_signed.pdf
Changed authority from FAR Part 6 to FAR Part 13
-------------------------------------------------------------------------
Eielson AFB requires 2 Bobcat UW56 toolcat, requirement must be brand name Bobcat UW56 M1225 with the below specifications to fulfill mission needs.
1st Bobcat UW56 M1225 with below specs
Deluxe Road Package M1225-P01-C01
Rear View Camera M1225-R20-C01
Engine Block Heater M1225-A01-C02
Traction Control M1225-R16-C02
Attachment Control M1225-R08-C02
68" Heavy Duty Bucket 7272679
Heavy Duty Battery M1225-R07-C02
Bolt-On Cutting Edge, 68" 6718006
Interior Trim M1225-A01-C04 84"
Snow Blade 6716836
Power Bob-Tach M1225-R14-C03
Hose Assembly, 91" Attachments 7145549
Snow Blower 32"x74" M7045
Motor Package 130cc 22-28 GPM M7045-R01-C03
12 Month/2000 Hour Full Extended Warranty 9986377
2nd Bobcat UW56 M1225 With below specs
Bobcat UW56 M1225 with the below specifications to fulfill mission needs:
Deluxe Road Package M1225-P01-C01
Attachment Control M1225-R08-C02
Engine Block Heater M1225-A01-C02
Heavy Duty Batter M1225-R07-C02
High Flow Package M1225-R03-C02
Interior Trim M1225-A01-C04
Power Bob-Tach M1225-R14-C03
Rear View Camera M1225-R20-C01
Traction Control M1225-R16-C02
62" Heavy Duty Bucket 7272678
Bolt-On Cutting Edge, 62" 6718005
2.5K Standard Duty Pallet Fork Frame 7297499
42" 2.5k Standard Duty Pallet Fork Teeth 7308798
Snow Pusher Pro, 6 ft (72 in.) Includes angle blade and removable pusher box 7406869
Snow Blower 32X74 M7045
Workgroup - Attachment Control Kit, 7-Pin 7439954
MOTOR PACKAGE 130CC (22-28 gpm) M7045-R01-C03 SP13
Sand and Salt Spreader 7453395
12 Month/2000 Hour Full Extended Warranty 9986377
Please see attatched SF 1449 Document and return it filled out to listed contacts below.

With GovernmentContracts, you can:
...improvements, clearing and grubbing, and utilities. more > Contract #:CFHWY00906Federal Project...
State Government of Alaska
Bid Due: 6/24/2026
...at Ted Stevens Anchorage International Airport. Work includes clearing and grubbing, pavement planing...
State Government of Alaska
Bid Due: 6/10/2026
..., drainage improvements, clearing and grubbing, and utilities. The Engineer's Estimate is between...
State Government of Alaska
Bid Due: 6/24/2026