| Location: | Oregon |
|---|---|
| Posted: | Nov 22, 2024 |
| Due: | Jan 17, 2025 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240BH25Q0002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The project consists of providing and installing a 600-amp transfer switch (manual or automatic) and connect to temporary power backup generator (provided by government).
Alternative: Provide and install a 400-amp transfer switch (manual or automatic) as an alternate and connect to temporary power backup generator provided by if 600-amp transfer switch is unavailable or has overly long lead time.
This alternative is not in addition to, but an alternate if larger transfer switch is unavailable.
Includes all necessary materials and labor to furnish and install the transfer switch and connect to temporary power generator.
Location: Redmond Air Center Tanker Base – Tank Farm, is located at Address: 1730 SE Ochoco Way, Redmond, OR 97756
The selection process, and evaluation criteria to be addressed, will be outlined in the forthcoming solicitation. The solicitation will be available for download exclusively via https://www.sam.gov not earlier than 12/16/2024. Paper copies of the solicitation will not be issued.
One Firm Fixed-Price (FFP) contract will be awarded. The contract period of performance is estimated to be 180 calendar days from the issuance of the Notice to Proceed.
The magnitude of this construction project is between $25,000 and $100,000. Payment Bond (100% of award) will be required of the successful awardee.
Note: Per FAR 52.204-7(b)(1), System for Award Management (SAM), an Offeror is required to be registered in SAM when submitting an offer and shall continue to be registered until time of award, during performance, and through final payment for any contract resulting from this solicitation. Information on registration may be obtained via: https://www.sam.gov. All Offerors must complete the electronic version of the Representations and Certifications in the SAM system.
This announcement serves as the Pre-Solicitation notice only. Responses to this synopsis are not required.
| Dec 18, 2024 | [Solicitation (Original)] Redmond Air Center Furnish and Install A new Automatic Transfer Switch |
| Jan 16, 2025 | [Solicitation (Updated)] Redmond Air Center Furnish and Install A new Automatic Transfer Switch |

With GovernmentContracts, you can:
...specifications. The work includes upgrading the associated Automatic Bypass Transfer Switch (ABT...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/18/2026
...upgrading the associated Automatic Bypass Transfer Switch (ABT) to match the new generator ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/18/2026