| Location: | Florida |
|---|---|
| Posted: | Apr 30, 2026 |
| Due: | Jun 4, 2026 |
| Agency: | Orlando Sanford |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-014-ITB |
| Publication URL: | To access bid details, please log in. |
Project ID: 2026-014-ITB
Title: SFB Midfield Utility Infrastructure Project-S. Beardall Avenue and Moores Station Road
Addenda: 0
Release Date: 4/30/2026
Due Date: 6/4/2026
The Sanford Airport Authority (SAA) is seeking sealed proposals from qualified conractors for the SFB Midfield Utility Infrastructure project. This project involves the installation of potable water and wastewater systems to be transferred to the City of Sanford upon completion.
The project is located along South Beardall Avenue and Moores Station Road in Sanford FL. The proposed utilities will be installed by the Sanford Airport Authority (SAA) and ultimately turned over to the City of Sanford. The force main will tie into an existing 8" stub at E. Lake Mary Blvd. The water main will tie into a 10" water main within the Airport fence and a 12" water main located on E. Lake Mary Blvd. Along with the utility installation, the project includes clearing and grading of Airport owned property located at the intersection of S. Beardall Avenue and Moores Station Road.
Key Technical Scope:
Water Main: 6,400 LF of 12" PVC/14"HDPE (tying into 10" and 12" existing mains).
Force Main: 5,400 LF of 4" PVC/4"HDPE (tying into an 8" stub at E. Lake Mary Blvd).
Appurtenances: Installation of fire hydrants, tapping sleeves, valves, flushing connections, and services.
Site Work & Logistics:
Clearing & Grading: Removal of 170 trees, plus shrubs and brush, along S. Beardall Ave and Moores Station Road.
Restoration of Right of Way: All right of way roadway and green space restoration must meet Seminole County standards.
Utility Coordination: Critical coordination required with FPL (including the removal of two poles) and Spectrum.
Site Constraints: Work spans City of Sanford and Seminole County jurisdictions; includes fence removal/restoration and crossings under existing pavement.
This project is being undertaken by the Sanford Airport Authority to expand and enhance critical utility infrastructure at and around Orlando Sanford International Airport. The work includes the installation of potable water and wastewater systems designed to support existing residential, commercial, and industrial development within the surrounding area.
In addition to addressing current service needs, the proposed improvements are intended to accommodate and stimulate future growth. The extension of utility infrastructure along Beardall Avenue and Moores Station Road will help enable planned aviation and non-aviation development, supporting long-term economic expansion and operational capacity in the airport’s vicinity.

With GovernmentContracts, you can:
...Description: VALVES, AIR RELEASE, PURCHASE, TERM CONTRACT Department: Purchasing Buyer: Kristen...
Palm Beach County
Bid Due: 11/22/2026
...Description: VALVES, AIR RELEASE, PURCHASE, TERM CONTRACT Department: Purchasing Buyer: Kristen...
Palm Beach County
Bid Due: 9/30/2026
...Description: VALVES, AIR RELEASE, PURCHASE, TERM CONTRACT Department: Purchasing Buyer: Kristen...
Palm Beach County
Bid Due: 2/03/2030
...Description: VALVES, AIR RELEASE, PURCHASE, TERM CONTRACT Department: Purchasing Buyer: Kristen...
Palm Beach County
Bid Due: 3/20/2030