| Location: | Idaho |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Sep 4, 2026 |
| Agency: | City of Caldwell |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Lincoln Lift Station Project - Package 1 - Lift Station Construction
Addenda: 0
Release Date: 7/15/2026
Due Date: 9/4/2026
The City of Caldwell is requesting statements of qualifications for the Lincoln Lift Station Package 1 - Lift Station Construction Project. The Project generally consists of an entire site built lift station including: structural cast-in-place concrete construction, site work, dewatering, masonry, metal fabrication, electrical components of entire pump station, electrical controls & monitoring devices, internal communications, HVAC/ventilation of pump station, stand-by generator, all associated pumps, site piping, internal lift station piping, valving, odor control system, applicable taxes, permits, site restoration, and SCADA controls to be properly connected with the City’s Wastewater Treatment Plant. This Request for Qualifications (“RFQ”) is intended to be administered in compliance with Idaho Code section 67-2805.

With GovernmentContracts, you can:
...lighting control systems to enhance functionality and reduce energy consumption. The scope of ...
ENERGY, DEPARTMENT OF
Bid Due: 1/29/2027
...Control drum actuators The Heat Management System (HMS) heat pipes Power Conversion System ...
ENERGY, DEPARTMENT OF
Bid Due: 9/24/2026
...Follow Long-Duration Energy Storage (LDES) Battery System Active Contract Opportunity Notice ID...) battery ...
ENERGY, DEPARTMENT OF
Bid Due: 9/24/2026
...ductwork, electrical, and control systems. Compliance with DOE, ASHRAE, and applicable safety... the ...
ENERGY, DEPARTMENT OF
Bid Due: 1/29/2027