| Location: | Idaho |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Sep 4, 2026 |
| Agency: | City of Caldwell |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Lincoln Lift Station Project - Package 1 - Lift Station Construction
Addenda: 0
Release Date: 7/15/2026
Due Date: 9/4/2026
The City of Caldwell is requesting statements of qualifications for the Lincoln Lift Station Package 1 - Lift Station Construction Project. The Project generally consists of an entire site built lift station including: structural cast-in-place concrete construction, site work, dewatering, masonry, metal fabrication, electrical components of entire pump station, electrical controls & monitoring devices, internal communications, HVAC/ventilation of pump station, stand-by generator, all associated pumps, site piping, internal lift station piping, valving, odor control system, applicable taxes, permits, site restoration, and SCADA controls to be properly connected with the City’s Wastewater Treatment Plant. This Request for Qualifications (“RFQ”) is intended to be administered in compliance with Idaho Code section 67-2805.

With GovernmentContracts, you can:
...improvements, traffic control, striping, utility-related work, landscaping restoration, and other...
West Ada School District (WASD)
Bid Due: 9/25/2026
...improvements, traffic control, striping, utility-related work, landscaping restoration, and other related...
West Ada School District (WASD)
Bid Due: 9/25/2026
...over raw material extraction. Secondary-use battery pathways where partial capacity restoration may...
ENERGY, DEPARTMENT OF
Bid Due: 11/01/2026