| Location: | New Mexico |
|---|---|
| Posted: | Jul 15, 2026 |
| Due: | Jul 28, 2026 |
| Agency: | City of Gallup |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Whole Block Reconstruction - Ciniza Drive, Gallup NM
Addenda: 0
Release Date: 7/14/2026
Due Date: 7/28/2026
This project is for the improvement of Ciniza Drive, a designated collector street. Work for this project includes the construction of a concrete box culvert, removal and replacement of sidewalks, drivepads, curb and gutter, and asphalt pavement. It also includes installation of waterline valves, and the relocation of fire hydrants. Other miscellaneous work includes ADA curb ramps, traffic signs, removal and replacement of existing fencing and landscaping. An additive alternate includes concrete pavement removal and replacement.
The street improvements are located in Gallup, New Mexico along Ciniza Drive. The project runs from the intersection of Ciniza Drive and Toltec Drive east 930-feet to an existing drainage channel.

With GovernmentContracts, you can:
...Follow SCIF Construction Upgrade Active Contract Opportunity Notice ID FA940126Z1001 Related... Building Construction ...
DEPT OF DEFENSE
Bid Due: 12/17/2026
...Follow Crownpoint Medical Gas Upgrade Construction Active Contract Opportunity Notice ID... to Department ...
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 8/11/2026
...Bid Number: RFP 25-08 Bid Title: On Call Owner's Representative and Construction Manager ...
Eddy County
Bid Due: 11/13/2026
...Project ID: Title: Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal..., Procurement ...
City of Gallup
Bid Due: 9/01/2026