| Location: | California |
|---|---|
| Posted: | Apr 21, 2025 |
| Due: | Apr 24, 2025 |
| Agency: | City of South San Francisco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SS2401, BID NO. 2690 |
| Publication URL: | To access bid details, please log in. |
Project ID: SS2401, BID NO. 2690
Title: OYSTER POINT BLVD SANITARY SEWER MAIN RECONSTRUCTION
Addenda: 4
Release Date: 3/14/2025
Due Date: 4/24/2025
General work description: The work consists of reconstructing the existing sanitary sewer main on Oyster Point Boulevard between Gull Drive and Gateway Boulevard in South San Francisco, CA with a new 18” HDPE Sanitary Sewer Pipe. The work includes installing the new pipe by open cut method, installing new manholes, reconstructing lower sewer laterals, abandoning segments of sewer main in place, pavement restoration, pavement dig-out repairs, and a 2” grind and overlay of the Asphalt Concrete pavement along the eastbound travel lanes on Oyster Point Boulevard.
The engineer’s estimate for this work is $6.4M. Detailed scope of work is included in the bid documents.

With GovernmentContracts, you can:
...RFI #26-02 - Removal of In-Ground Vehicle Lifts & Concrete Slab Restoration Appendix ...
Monterey-Salinas Transit
Bid Due: 6/18/2026
...; and installation of concrete curbs and sidewalks. Additional work includes installation of ...
Sutter County
Bid Due: 7/09/2026
...concrete box culvert and retaining wall, installation of aggregate base and hot mix ...
Sutter County
Bid Due: 6/25/2026
...concrete box culvert and retaining wall, installation of aggregate base and hot mix ...
Sutter County
Bid Due: 6/25/2026