| Location: | Alaska |
|---|---|
| Posted: | Nov 6, 2025 |
| Due: | Nov 28, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | W911KB26RA002 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Repair the Skagway River Levee to restore its functionality to the pre-disaster conditions it has sustained as a result of significant flooding events. The levee is located along the southeast bank of the Skagway River starting at the Klondike Highway Bridge in Skagway and was constructed between 1939-1940 with its original length being 6,700 feet. All but a roughly 1,300-foot portion of the levee was modified by DOT and PF in 2001, encapsulating the original levee and adding Class III and IV armor stone along the riverward side slopes. The levee protects public infrastructure as well as residential, commercial, and historical properties. Damage to the levee includes loss of riverward armor stone and toe width reduction. The aim of this project is to rebuild the levee toe and damaged side slopes with USACE POA designated riprap gradation and a 1.5 horizontal (H) to 1 vertical (V) side slope. The construction length is approximately 6,000 linear feet (LF). The type of contract shall be firm-fixed price. Construction wage rates (formerly Davis-Bacon Act wage rates) shall apply. Amendment 01 was posted on 5 November 2025 via PIEE Solicitation Module.
| Oct 1, 2025 | [Presolicitation (Original)] Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska |
| Oct 17, 2025 | [Presolicitation (Updated)] Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska |
| Oct 28, 2025 | [Solicitation (Original)] Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska |
| Nov 14, 2025 | [Solicitation (Updated)] Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska |
| Nov 21, 2025 | [Solicitation (Updated)] Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska |

With GovernmentContracts, you can:
Follow Repair Bld Moisture Barrier Proj 463-21-101 Active Contract Opportunity Notice ID 36C26026R0061_RFP
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/29/2026
Number Deadline ITB26-024 Nikiski Fire Station #2 Fill Site Repair The Kenai Peninsula
Kenai Peninsula Borough
Bid Due: 6/18/2026
2526H265 Grader Blades - Central Region 2526H265 ITB TITLE: 2526H265 Grader Blades -
State Government of Alaska
Bid Due: 6/11/2026
ITB 2526H233 Circle Rural Airport Maintenance -AMENDED Amendment #2 The purpose of Amendment
State Government of Alaska
Bid Due: 6/16/2026