| Location: | South Carolina |
|---|---|
| Posted: | Dec 1, 2025 |
| Due: | Jan 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | H09-9628-CB-A |
| Publication URL: | To access bid details, please log in. |
Scope of work includes roof replacement of low slope roofing down to the existing concrete deck on roof area A – E. Removal of all existing clay roof tiles and associated sheet metal flashings. Installation of plywood overlay, self-adhering underlayment and new flat interlocking clay tile. Preparation and installation of new fluid applied coating on exterior stucco walls above the roof. Replacement of two existing window units and three doors on elevations shown on the drawings.

With GovernmentContracts, you can:
...29420 Project Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project...: Dorchester School ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/05/2026
...of Chesnee Project Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project... of ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/22/2026
...for Economic Development Project Delivery Method: Design-Bid-Build Construction Cost Range: $2,500,000... to $3,000,000 ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/02/2026