USCGC Alder Cargo Hatch Welding

Location: California
Posted: Apr 30, 2026
Due: May 11, 2026
Agency: HOMELAND SECURITY, DEPARTMENT OF
Type of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: 70z08526Q0024676
Publication URL: To access bid details, please log in.
Follow
USCGC Alder Cargo Hatch Welding
Active
Contract Opportunity
Notice ID
70z08526Q0024676
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
US COAST GUARD
Office
SFLC PROCUREMENT BRANCH 2(00085)
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Original)
  • Original Published Date: Apr 30, 2026 09:55 am PDT
  • Original Date Offers Due: May 11, 2026 08:00 am PDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: May 26, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J020 - MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
  • NAICS Code:
    • 336611 - Ship Building and Repairing
  • Place of Performance:
    San Francisco , CA 94130
    USA
Description

Statement of Work

USCGC ALDER (WLB 216)

Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew

1. Purpose and Scope

. KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping

located in compartment 2-30-0-AA, Cargo Hold.

2. Deliverables and Performance Requirements

. Protective measures: The KTR must furnish and install all protective measures IAW

SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment

protection).

. Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000,

(Interferences).

. Contamination prevention: The KTR must take all precautions to prevent

contamination of personnel and spaces IAW all applicable Federal, state, and local

regulations.

. Fluid handling: The KTR must remove and dispose of removed fluids from the

affected piping system, IAW all applicable Federal, state, and local regulations. Do not

drain any fluids into any spaced, bilge, or exterior location.

. Piping renewal particulars: The KTR must accomplish the following tasks, using

Coast Guard Drawing 225–WLB–528–001, REV K as guidance:

o Crop out necessary length of piping (3” & 2” diameter), to include all necessary

funnel pieces of the cofferdam system.

o Fabricate necessary piping arrangement previously cropped IAW CG Drawing.

o Install all fabricated piping to include all required gaskets/seals IAW CG

Drawing.

o KTR must provide a means of sealing any open piping while any portion of the

system is open (i.e.: upstream valve blind flange).

. Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary.

. Pipe labeling: The KTR must label affected piping as follows:

o Name of the piping system service.

o Destination, where feasible.

o Direction of flow, indicated by an arrow three inches long pointing away from

the lettering.

. Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.)

joint repairs, the Contractor must test the affected piping system's operation using the

system fluid at normal operating pressure. Ensure zero visible leakage from or

deformation of mechanical parts by repairing all leaks and discrepancies.

. Touch-up preservation: The KTR must prepare and coat all new and disturbed

surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310,

(Touch-ups and minor coating repairs.)

. Piping insulation installation: The KTR must install new insulation materials over

the exposed pipe surfaces at thicknesses appropriate to the application and temperature

ranges specified in ASTM F683 Tables.


Attachments/Links
Contact Information
Contracting Office Address
  • COAST GUARD ISLAND, BLDG 50-7
  • ALAMEDA , CA 94501
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Apr 30, 2026 09:55 am PDTCombined Synopsis/Solicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

..., replacement of a manhole with a new 84-inch manhole and installation of ...

Orange County Sanitation District

Bid Due: 7/31/2026

..., installation of approximately 1,270 linear feet of 12-inch PVC pipe, and replacing ...

Los Angeles County Sanitation Districts

Bid Due: 6/23/2026

..., installation of approximately 1,270 linear feet of 12-inch PVC pipe, and replacing ...

Los Angeles County Sanitation Districts

Bid Due: 6/23/2026

...and installation of the following: potholing, concrete curb ramps, concrete curb and gutter, ...

City of Dublin

Bid Due: 6/09/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.