| Location: | Federal |
|---|---|
| Posted: | Dec 17, 2024 |
| Due: | Jan 7, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA8538-25-R-0004 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Pre-Solicitation, Overhaul of the C-5 Trunnion Bearing
The Air Force has a requirement for overhaul of the C-5 Trunnion Bearing for use by the United States Air Force (USAF) in support of the C-5 Galaxy cargo aircraft.
Notice ID: FA8538-25-R-0004
This Synopsis for the requirement is being issued by AFSC/PZAAB (FA8538).
NSN: 3120-00-766-2056 UC
Noun: Bearing, Trunnion
Synopsis is for issuance of a Firm-Fixed Price (FFP), Indefinite Delivery Indefinite Quantity (IDIQ) type Request for Proposal (RFP), FA8538-25-R-0004, for depot-level overhaul/remanufacture services applicable to the C-5 Trunnion Bearing for use by the USAF in support of the C-5 Galaxy cargo aircraft. This item is the main pivot bearing used during the retraction and extension of the C-5 Main Landing Gear (MLG) and is a safety critical item, failure of which could cause the loss of aircraft and crew. The anticipated overhaul/remanufacturing service will provide serviceable assets to meet quarterly demand for Air Force Field Level requirements and C-5 Programmed Depot Maintenance (PDM). The C-5 MLG Trunnion bearings will support C-5 aircraft until 2040.
The FFP/IDIQ contract is planned for 5-years in length utilizing Delivery Protection Program (DPP) Competitive procedures: The Delivery Protection Program is a contractual vehicle which provides the Contracting Officer a means of competing the maximum practical quantity of a requirement while also mitigating risk. The objective of the DPP is to obtain the best possible price and performance while mitigating risk by allowing new unqualified sources to submit a proposal on complex or critical items requiring pre-production unit approval, ensuring the new source can furnish a product that conforms to all contract requirements for acceptance.
Qualified Source: Contractors which have successfully demonstrated the ability to overhaul the Trunnion Bearing
Unqualified Source: Contractors who have the capability to perform the overhaul and who wish to become a Qualified Source
The anticipation is the RFP will have two (2) Alternatives:
Alternate 1 is anticipated if either A) only Qualified Sources submit bids, or B) only Unqualified Sources submit bids and no Qualified Source participates. If A or B is true, the low offeror will be awarded the 5-year FFP/IDIQ contract.
Alternate 2 is anticipated if both a Qualified Source and Unqualified Source submit bids and the Unqualified Source is the low bidder. If this is true, two contracts will be awarded simultaneously: Contract A and Contract B. Contract A will be a 24-month IDIQ awarded to the Qualified Source to complete Mission Essential Quantities (MEQ), and three (3) 12-month Option Years awarded if the Unqualified Source does not become Qualified. Contract B will be a 24-month IDIQ awarded to the Unqualified Source for 2 Each pre-production units (a qualification period), and three (3) 12-month Option Years which may be exercised if becoming Qualified.
Basic Option (2-years) to the proven source [Alt 1, Qualified Source; or Alternate II, Contract A]:
Basic Option (2-years) Pre-Production to the unproven source [Alternate I, Unqualified Source; or Alternate II, Contract B]:
Option Years [Alternate I; or Alternate II, Contract A or B]:
This acquisition will be Full and Open Competition utilizing Delivery Protection Program (DPP) Competitive procedures. Period of Performance is anticipated to begin May 2025 for a period of 5 years (FY25 - FY30). The Solicitation (Request for Proposal) posting will follow this Synopsis, and is anticipated to be posted on or after 3 January 2025.

With GovernmentContracts, you can:
...Maintenance Shop to sustain reliable life-safety and fire protection system functionality over... the ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 7/06/2026
..., bank closings, bank liquidations, asset management and disposition); restructuring... literacy and digital ...
TREASURY, DEPARTMENT OF THE
Bid Due: 6/30/2026
...1423-1 DATA ITEM NO. A001, A002, A003 COMMERCIAL ASSET VISIBILITY AIR FORCE REPORTING ...
DEPT OF DEFENSE
Bid Due: 6/19/2026