04142026 Notice to Contractors - TYPE II TRAFFIC SIGNAL UPGRADES IN DISTRICT 7, 2026 EDGEFIELD CTC RESURFACING, INTERSECTION IMPROVEMENT S-540 @ L1969, BRIDGE REPAIR US 29 OVER ENOREE RIVER IN GREENVILLE COUNTY

Location: South Carolina
Posted: Mar 10, 2026
Due: Apr 14, 2026
Agency: State of South Carolina - Department of Transportation (SCDOT)
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Letting Date Type Name
4/14/2026

Attachment Preview

SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS
For April 14, 2026
Letting Location:
SCDOT Headquarters Building
Conference Room 331
955 Park Street, Columbia, SC
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and posted
on the SCDOT web site, Bid Express, and the Construction Extranet immediatley after bids are opened.
The following items will be made available on March 14, 2026 unless otherwise noted:
• Proposal bid forms on the Bid Express website (www.bidx.com)
• Construction Standards can be found under Business via SCDOT web site (www.scdot.org)
Access the Construction Extranet (https://www.scdot.org/business/constructionletting-extranet.aspx). for the
following items:
• Proposals
• Plans
• Announcements
• Bids as Received
• CPM Schedule Templates
• Contractor Discussin Board
Contractors are encouraged to utilize the Discussion Board to make contact with other Prime and
Subcontractors to request/offer quotes. There is no charge to access this site, but you must register for a
user name and password.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)
issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarter
issued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at (803)737-
2031.
Hardcopy plans and proposals are available via Engineering Publications:
o Printed upon request only, call ahead for pickup orders
o Located in room G23 SCDOT Headquarters
o Email PlanStorage@scdot.org /Phone (803)737-4533/ Fax (803)737-4530
o Proposals are $15 and Plans are $2 per sheet
o Cash, check, money order, VISA/MC accepted payable to SCDOT (No refunds)
o Contractors do not have to buy plans to be able to bid
o The Voluntary Plan Holders List is available on BIDX.
Please contact the Contract Administration Office at (803)737-7469 with all Letting related questions.
South Carolina Department of Transportation
3/10/2026
Call No.: 010
Letting Date: April 14, 2026
Letting Time: 2:00 pm
Page: 1
SC File NO(S).: 0260470
PCN: P040848
Project No.: P040848
DBE Goal Percent: 0.00%
Approx. Length (miles):0.3000
CO(S).: Aiken
Description: TYPE II TRAFFIC SIGNAL UPGRADES IN
DISTRICT 7
Completion Date: 4/30/2028 Days
Funding: ST
ITEMS OF WORK INCLUDE THE FOLLOWING:
Description
MOBILIZATION
BONDS AND INSURANCE
TRAFFIC CONTROL
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
REMOVAL OF PAVEMENT MARKINGS
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN
MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED)
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK)
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE
SAWCUT FOR LOOP DETECTOR
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
F&I-17"X30"X24"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD
FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001
FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002
F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD
F&I-PED PUSH BUT.SOLID STATE W/ TONE ASSEM 9"X15"&SIGN (R-10-3E or R10-
4a)
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG.
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT
Quantity Units
1.000 LS
1.000 LS
1.000 LS
50.000 LF
1,480.000 LF
395.000 LF
110.000 LF
24.000 SF
3.000 EA
200.000 LF
1,005.000 LF
150.000 LF
490.000 LF
3,585.000 LF
4,750.000 LF
2,640.000 LF
3,702.000 LF
1,491.000 LF
3.000 EA
21.000 EA
3.000 EA
12.000 EA
1,130.000 LF
11.000 EA
3.000 EA
2.000 EA
3.000 EA
26.000 EA
24.000 EA
24.000 EA
31.000 EA
1.000 LS
South Carolina Department of Transportation
3/10/2026
Call No.: 010
Letting Date: April 14, 2026
Letting Time: 2:00 pm
Page: 2
Description
TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT
REMOVE FOUNDATION FOR STEEL STRAIN POLE - 18" BELOW GRADE
FURNISH & INSTALL CONCRETE CABINET FOUNDATION
FURNISH & INSTALL RADAR FOR STOP BAR DETECTION, INC 150' CABLE &
MOUNTING HARDWARE
FURNISH & INSTALL CABINET INTERFACE COMPONENTS FOR RADAR
DETECTION
FURNISH & INSTALL RADAR FOR SETBACK DETECTION, INC 150' CABLE &
MOUNTING HARDWARE
DETECTABLE WARNING MATERIAL
PEDESTRIAN RAMP CONSTRUCTION
Quantity Units
3.000 EA
4.000 EA
3.000 EA
2.000 EA
1.000 EA
2.000 EA
75.000 SF
150.000 SY
South Carolina Department of Transportation
3/10/2026
Call No.: 020
Letting Date: April 14, 2026
Letting Time: 2:00 pm
Page: 1
SC File NO(S).: 1976490
DBE Goal Percent: 0.00%
Approx. Length (miles):1.7000
CO(S).: Edgefield
PCN: P045184
PCN: P045186
Project No.: P045184
Project No.: P045186
Description: 2026 EDGEFIELD CTC RESURFACING
Completion Date: 7/31/2027 Days
Funding: CTC
ITEMS OF WORK INCLUDE THE FOLLOWING:
Description
MOBILIZATION
BONDS AND INSURANCE
BORROW EXCAVATION
EXCAVATION FOR SHOULDER PAVING
HAULING OF EXCAVATED SHOULDER MATERIAL
MAINTENANCE STONE
HMA SHOULDER WIDENING COURSE
LIQUID ASPHALT BINDER PG64-22
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF.
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE)
ASPHALT SURFACE COURSE TYPE C
DRIVEWAY PAVING-SURFACE TYPE C
TRAFFIC CONTROL
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL.
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS
Quantity Units
1.000 LS
1.000 LS
340.000 CY
139.000 STA
139.000 STA
40.100 TON
653.253 TON
177.998 TON
510.000 SY
2,650.000 SY
700.000 SY
2,183.157 TON
123.750 TON
1.000 LS
446.000 SF
180.000 LF
35,920.000 LF
180.000 LF
920.000 LF
35,460.000 LF
90.000 LF
17,960.000 LF
90.000 LF
460.000 LF
17,730.000 LF
113.000 EA
1.650 ACRE
South Carolina Department of Transportation
3/10/2026
Call No.: 030
Letting Date: April 14, 2026
Letting Time: 2:00 pm
Page: 1
SC File NO(S).: 2372300
PCN: P041423
Project No.: P041423
DBE Goal Percent: 0.00%
Approx. Length (miles):0.2410
CO(S).: Greenville
Description: INTERSECTION IMPROVEMENT S-540 @ L-
1969
Completion Date: 7/31/2027 Days
Funding: FED
ITEMS OF WORK INCLUDE THE FOLLOWING:
Description
MOBILIZATION
BONDS AND INSURANCE
CONSTRUCTION STAKES, LINES & GRADES
CPM PROGRESS SCHEDULE
CLEARING & GRUBBING WITHIN RIGHT OF WAY
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT
UNCLASSIFIED EXCAVATION
BORROW EXCAVATION
FINE GRADING
MAINTENANCE STONE
LIQUID ASPHALT BINDER PG64-22
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF
MILLING EXISTING ASPHALT PAVEMENT 2.0"
ASPHALT BASE COURSE - TYPE A
ASPHALT BASE COURSE - TYPE B
ASPHALT INTERMEDIATE COURSE TYPE B
ASPHALT SURFACE COURSE TYPE E
TRAFFIC CONTROL
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED)
TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4"
TEMPORARY YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X4"
TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4"
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL.
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL.
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL.
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL.
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4"
Quantity Units
1.000 LS
1.000 LS
1.000 EA
1.000 LS
1.000 LS
240.000 SY
185.000 CY
1,225.000 CY
1,300.000 SY
60.000 TON
119.000 TON
150.000 SY
3,875.000 SY
341.000 TON
113.000 TON
1,710.000 TON
108.000 TON
1.000 LS
368.000 SF
10.000 EA
20.000 EA
60.000 EA
690.000 LF
390.000 LF
1,380.000 LF
2,535.000 LF
8,700.000 LF
230.000 LF
130.000 LF
460.000 LF
845.000 LF
2,900.000 LF
10.000 EA
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Ad Title: *On-Call Bridge Fender Repair District 6 Purchasing Agent/Entity: Department... to provide ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/25/2026

...) is soliciting bids from qualified contractors to perform bridge deck repairs on ...

State of South Carolina - State Fiscal Accountability Authority(SFAA)

Bid Due: 6/23/2026

...Follow Repair and Widen Taxiways Phase III, PSTE 162013 Active Contract Opportunity Notice ...

DEPT OF DEFENSE

Bid Due: 6/23/2026

...Follow Repair Intersection Runway 03-21 & 15-33 Active Contract Opportunity Notice ID... AND ...

DEPT OF DEFENSE

Bid Due: 6/18/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.