| Location: | Federal |
|---|---|
| Posted: | Jun 5, 2025 |
| Due: | Jun 17, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA527025R0032 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This project shall accomplish a design-build replacement of the fuel tanks located at the following facilities. B176, B329, B613, B786, B1206, B3413, B3489, B3506.
Replace the listed fuel and waste oil storage tanks on Kadena Air Base. New tanks shall be Convault tanks, or an approved equal, to mitigate leak and corrosion. Refer to Kadena Design Guide sections 13.11.1-3, and 21.1.7 for more guidance. Some tanks have tested positive for asbestos and/or lead based paint, which will require abatement. Work also includes all necessary replacement of associated piping and accessories to ensure the tanks are complete and usable. Include seismic protection, antiterrorism, and fire protection measures as required. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Work for the project is described in more detail in Section 8 of this Statement of Work (SOW). Sustainable principles, to include life cycle cost- effective practices shall be integrated into the design, development, and construction of the project(s) in accordance with the latest version of UFC 1-200-02, High Performance and Sustainable Building Requirements.
Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).
| Jun 17, 2025 | [Presolicitation (Original)] Replace Kadena Tanks LXEZ241015 |
| Jul 3, 2025 | [Solicitation (Original)] Replace Kadena Tanks LXEZ241015 |
| Jul 29, 2025 | [Solicitation (Updated)] Replace Kadena Tanks LXEZ241015 |
| Aug 13, 2025 | [Solicitation (Updated)] Replace Kadena Tanks LXEZ241015 |

With GovernmentContracts, you can:
...contractor s responsibility for abatement of any asbestos, lead, and other hazardous materials... ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/09/2026
...windowsills. The contractor shall also provide asbestos and lead abatement for approximately 100 ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026