| Location: | Florida |
|---|---|
| Posted: | Jun 10, 2025 |
| Due: | Jun 20, 2025 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQu-25-009 |
| Publication URL: | To access bid details, please log in. |
Project Description: Tohopekaliga Water Authority (Toho) is seeking Statements of Qualifications (SOQ) from experienced and qualified engineering consulting firms as part of the South Poinciana Blvd Transmission Water Main Infrastructure Project. The selected firm shall demonstrate a strong background in designing and implementing large-diameter transmission pipelines. This project involves design, permitting, surveying, and construction engineering services for approximately 12,500 linear feet of 30-inch water main to be installed along South Poinciana Boulevard in parallel with existing water mains from Crescent Lakes Way to South Orange Blossom Trail.

With GovernmentContracts, you can:
Project ID: Title: Median Holiday Lights Phase 3C Addenda: 0 Release Date: 9/11/2026
City of Dania Beach
Bid Due: 10/02/2026
Project ID: 26-8677 Title: Adaptive Traffic Control System-Grant Funded Addenda: 0 Release Date:
Collier County
Bid Due: 10/12/2026
Solicitation Details You can review the detailed information about the solicitation here. If
Manatee County
Bid Due: 10/07/2026
NOTICE OF INVITATION TO BID STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION BID
State Government of Florida
Bid Due: 10/13/2026