| Location: | Georgia |
|---|---|
| Posted: | Sep 30, 2026 |
| Due: | Nov 5, 2026 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-72200-NONST-2027-000000092 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-72200-NONST-2027-000000092 | REBID Haralson Mill Rd. Covered Bridge Rehabilitation | Rockdale County Board Of Commissioners |
Sep 30, 2026 @ 03:21 PM
|
Nov 05, 2026 @ 02:00 PM
|
Start Date: Sep 30, 2026 @ 03:21 PM ET
End Date:
Nov 05, 2026 @ 02:00 PM ET
The Rockdale County Board of Commissioners is soliciting sealed bids to furnish all labor, material,
and equipment for the Haralson Mill Road Covered Bridge Rehabilitation (Bridge Deck
Replacement and Structural Repairs) in Rockdale County.
| Code | Description |
| 91313 | Construction, Bridge and Drawbridge, Including Reconstruction and Rehabilitation |
| 91366 | Maintenance and Repair, Bridges |
Adrienne Brown
adrienne.m.brown@rockdalecountyga.gov
770-278-7557
ROCKDALE COUNTY, GEORGIA
INVITATION TO BID #26-20
REBID
ROCKDALE COUNTY
Haralson Mill Road Covered Bridge Rehabilitation
(Bridge Deck Replacement and Structural Repairs)
For
Rockdale County Department of Transportation
ROCKDALE COUNTY
DEPARTMENT OF TRANSPORTATION (RDOT)
CONTRACT # C-2026-
TABLE OF CONTENTS FOR CONSTRUCTION DOCUMENTS
BIDDING DOCUMENTS Page
Invitation to Bid...................................................................... BD.1
Liquidated Damages..................................................................................... BD.2
Notice to Contractors............................................................... BD.3
Bid Proposal.......................................................................... BD.4
Bid Bond.............................................................................. BD.8
Certification by Contractor Regarding Non-Segregated Facilities............BD.10
Non-collusion Affidavit of Prime Bidder........................................ BD.11
Non-collusion Affidavit of Subcontractor....................................... BD.12
Affidavit Verifying Status for County Public Benefit Application............ BD.13
Certifications......................................................................... BD.14
Contractor Affidavit under O.C.G.A. 13-10-91(b)(1) ........................ BD.16
Subcontractor Affidavit under O.C.G.A. 13-10-91(b)(3)..................... BD.17
Subcontractor Affidavit under O.C.G.A. 13-10-91(b)(4)..................... BD.18
Subcontractor Notification List.................................................... BD.19
Bid Schedule of Items .............................................................. BD.20
CONTRACT DOCUMENTS
CONTRACT AGREEMENT:
Sample Contract Agreement........................................................ II-2
100% Performance Bond........................................................... II.4
100% Labor and Material Payment Bond........................................ II.6
Subcontractor Notification List.................................................... II.9
Non-Collusion Affidavit of Subcontractor....................................... II.10
Contract Schedule of Items ................................................................... II.11
GENERAL CONDITIONS:
GENERAL PROVISIONS
Section 101 Definition and Terms.............................................
Section 150 Traffic Control....................................................
1. SCOPE OF WORK
Roadways............................................................................
Special Construction Methods....................................................
2. SEQUENCE OF OPERATIONS
General................................................................................
Order of Work........................................................................
Special Conditions..................................................................
Equipment Noise and Operations.................................................
Utility Conflicts.....................................................................
Addenda...........................................................................
APPENDICES:
Appendix A - Individual Roadways ........................................
Appendix B - Itemized Quantities ........................................
Appendix C - Awarded Contractors Bid ........................................
Appendix D - Additional Special Provisions ..................................
Appendix E - Pavement Evaluations..............................................
ROCKDALE COUNTY, GEORGIA
INVITATION TO BID #26-20
ROCKDALE COUNTY - Haralson Mill Road Covered
Bridge Rehabilitation (Bridge Deck Replacement and
Structural Repairs)
BIDDING DOCUMENTS
For
ROCKDALE COUNTY DEPARTMENT OF
TRANSPORTATION (RDOT)
CONTRACT # C-2026-
ITB #26-20 9/2026
INVITATION TO BID #26-20
ROCKDALE COUNTY, GEORGIA
The Rockdale County Board of Commissioners is soliciting sealed bids to furnish all labor, material,
and equipment for the Haralson Mill Road Covered Bridge Rehabilitation (Bridge Deck
Replacement and Structur al Repairs) in Rockdale County.
Bids will be accepted until the bid opening date and time on November 5, 2026, at 2:00 p.m.
in the Department of Finance, 981 Milstead Avenue, Conyers, Georgia 30012.
The SPLOST 5C program goals include several objectives from the Rockdale County Board
of Commissioners, their selected Road Committee members and RDOT engineering staff that
will enhance the safety, ride, longevity and drainage of our network of roadways in the
County. Special attention should therefore be given to the entirety of the scope of the enclosed
ITB during the bidding stages of this project. The contractors bidding for this ITB are encouraged to
visit the individual site prior to submittal of their bid.
There will be a MANDATORY Pre-Bid Conference held via TEAMS, at 10:00 a.m., local time,
Thursday, October 22, 2026. Prime bidders who arrive more than 5 minutes after the start of
the meeting (as stated in the solicitation and by the Procurement representative's watch) or after
the discussion portion of the meeting (whichever comes first) may not be permitted to submit a bid
on the project. Any questions and/or misunderstandings that may arise from this ITB may be
asked and answered at the pre-bid conference; however, oral responses are not authoritative.
Bidders are encouraged to review the ITB before attending the pre-bid conference. Questions
received after the pre-bid conference must be submitted in writing to
Adrienne.m.brown@rockdalecountyga.gov or at the above address. Any contractor who intends to
submit a bid is required to attend this meeting.
Submit questions and/or requests for clarifications regarding this bid no later than October 29,
2026, by 2:00 p.m. Written responses from the County to the questions it receives will be issued
in an addendum. Any questions and/or misunderstandings that may arise from this BID
must be submitted in writing and forwarded to the Department of Finance by email at
adrienne.m.brown@rockdalecountyga.gov.
It shall be the Bidders responsibility to seek clarification as early as possible prior to the due date and
time.
A 5% Bid Bond will be required. A Payment and Performance Bond in the amount of 100% will be
required from the awarded vendor.
ITB #26-20 BD.1 9/2026
NOTICE: LIQUIDATED DAMAGES
Per GDOT Definition 101.35 Liquidated Damages:
The fixed charges assessed against the successful Bidder or the Contractor for failure to execute the
Contract or to complete the Contract within the Contract Time.
As such please note the following type of Liquidated Damages for this ITB and subsequent
contract:
A. For each day after the allotted time frame in the contract that the work is not competed in full, with the
punch list finished to the satisfaction of the RDOT Director and the County a per calendar day penalty
will be deducted from the payment to the Contractor per GDOT Current edition of the Standard
Specifications. Please refer to Section 108.08, In the 2024 GDOT Supplemental Specifications for
further details.
ITB #26-20 BD.2 9/2026
Section 108-Prosecution and Progress
108.01 Subletting of Contract
The Contractor shall not sublet, sell, transfer, assign, or otherwise dispose of the Contract or Contracts, or any portion
thereof, or of his/her right, title, or interest therein, without written consent of the Engineer. For Subcontracts, consent of the
Engineer will not be considered until after award of the Contract.
In case such consent is given, the Contractor will be permitted to sublet a portion thereof, but shall perform, with his/her own
organization, work amounting to not less than thirty percent (30%) of the total Contract cost, including materials, equipment,
and labor.
As further exception, any items designated as Specialty Items may be performed by Subcontract and the cost of any such
Specialty Items so performed by Subcontract may be deducted from the total cost before computing the amount of work
required to be performed by the Contractor with his/her own organization.
Purchase of materials by the Prime Contractor for use by a Subcontractor will not be allowed when computing the 30%
requirement.
No Subcontracts, or transfer of Contract, shall in any case release the Prime Contractor of his/her liability under the Contract
and Bonds. No Subcontractor shall commence work in advance of the written approval of the Subcontract by the Department.
Except for certain items exempted by the State Transportation Board, or for Subcontracts totaling $250,000 or less, each
Subcontractor shall be prequalified or registered with the Department. Each Subcontract for a Registered Subcontractor shall
not exceed $1,000,000 and Subcontracts for Prequalified Contractors shall not exceed their current capacity. Prequalified or
Registered Subcontractors shall be qualified or registered with the Department in accordance with Chapter 672-5 of the Rules
and Regulations Governing the Prequalification of Prospective Bidders adopted by the State Transportation Board.
In the event any portion of a Subcontract is further sublet, all of the provisions governing subletting, including registration
and written approval by the Engineer, shall apply.
This Sub-Section shall not apply to Contracts between the Department and counties, municipalities, or other State agencies.
All subcontract agreements between the Prime Contractor and subcontractor shall be in writing and shall contain all of the
Federal-Aid requirements and pertinent provisions of the Prime Contract. The Prime Contractor shall, upon request by the
Engineer, furnish copies of any subcontract agreement to the Department within ten (10) days of such request. This provision
applies to all subcontracts, including second or multi-tier subcontracts.
According to the provisions stated above, the following items are designated Specialty Items for general transportation
system construction and building construction whenever they appear in the Contract:
General Transportation System Contracts
Grassing items
Fencing items
Highway lighting items
Sign items
Guardrail items (except bridge handrail)
Utility items
Comfort and convenience items in rest areas
Landscaping items
Pressure grouting, slab removal and replacement
Permanent traffic markings
Page 1
Section 108-Prosecution and Progress
Signal systems
Railroad track work above sub-ballast
Drilled caisson foundations
Construction layout
Asphaltic concrete leveling and asphalt concrete patching (when used on surface treatment and slurry seal resurfacing
contracts)
Building Contracts
Structural Steel
Plumbing
Heating, ventilation, and air conditioning (HVAC)
Electrical
Telephone service
Masonry
Glass work
Drywall
Ceiling installation
Roofing
Carpentry
Floor covering
Raised flooring
Landscaping
Security system
Fire protection
Gutters
Painting
Insulation
Doors
Elevators
Construction layout
The Contractor's cost for Construction Layout shall be fully documented prior to deduction from the original Contract
amount)
108.02 Notice to Proceed
The delivery to the Contractor of a notice, stating that construction is authorized, constitutes Notice to Proceed. The
Contractor shall do no work under the Contract until receipt of the Notice to Proceed, and the Department will not be
obligated to pay for work done prior to receipt of the Notice to Proceed.
Within 10 calendar days after the Notice to Proceed has been issued, the Contractor shall begin the Work. Contract Time
charges for Available Day and Calendar Day projects will begin on the date the Contractor starts to work, or 10 days after the
Notice to Proceed, whichever occurs first. For Completion Date projects Contract Time charges shall begin on the day after
the Notice to Proceed.
Page 2
Section 108-Prosecution and Progress
Where the Contractor's access to part of the right-of-way is restricted, either the Special Provisions in the Contract or the
Conditional Notice to Proceed will indicate such restrictions. The Department may, at its option, issue a Conditional Notice
to Proceed if, in the opinion of the Engineer, a sufficient portion of the right-of-way is available to the Contractor to allow
construction to proceed.
108.03 Prosecution and Progress
The Contractor shall provide sufficient materials, equipment, and labor to guarantee the completion of the Project in
accordance with the Plans and Specifications within the time set forth in the Proposal. Unless otherwise required by the
Engineer, each operation shall begin as soon after the Contract is awarded as conditions will permit. Each class of work will
be expected to continue from the date it is begun until it is completed.
The Contractor shall furnish the Engineer, for approval, a Progress Schedule immediately following the receipt of the Notice
to Proceed. Unless otherwise specified, the schedule shall be prepared on forms furnished by the Department or an acceptable
critical path schedule will be used as the basis for establishing the controlling items of work and as a check on the progress of
The Work. This Schedule will not be required on resurfacing projects.
Approval of the Progress Schedule shall not be construed to imply approval of any particular method or sequence of
construction or to relieve the Contractor of providing sufficient materials, equipment, and labor to guarantee the completion
of the Project in accordance with the Plans, Specifications, and Special Provisions within the time set forth in the Proposal.
Contract Time as shown in the Proposal is the allowable time. The Contractor's proposed Progress Schedule may indicate a
completion date in advance of the Contract Specified Completion Date; however, the Department will not be liable in any
way for the Contractor's failure to complete the project prior to the Contract Specified Completion Date.
At least 48 hours before commencing The Work, the Contractor shall notify the Engineer of his intention to begin so that
proper inspection may be provided. Should the prosecution of The Work be discontinued for any reason, the Contractor shall
notify the Engineer at least 24 hours in advance of resuming operations.
If the Contractor's operations are materially affected by changes in the Plans or in the amount of work, or if he has failed to
comply with the approved schedule, the Contractor shall submit a revised Progress Schedule, if requested by the Engineer,
which schedule shall show how he proposes to prosecute the balance of The Work. The Contractor shall submit the revised
Progress Schedule within 10 days after the date of the request. The Contractor shall incorporate into every Progress Schedule
submitted, any contract requirements regarding the order of performance of portions of The Work.
No payments will be made to the Contractor while he is delinquent in the submission of a Progress Schedule or a revised
Progress Schedule.
108.04 Limitation of Operations
The Contractor shall conduct The Work at all times in such a manner and in such sequence as will assure the least
interference with traffic and shall provide for smooth and safe traffic flow. It shall be the decision of the Engineer as to what
will assure the least interference with traffic and smooth, safe traffic flow. Also, the Engineer may require the Contractor to
finish a section on which work is in progress before work is started on any additional sections if the opening of such section
is essential to public convenience.
108.05 Character of Workers, Methods and Equipment
The Contractor shall at all times employ sufficient labor and equipment for prosecuting the several classes of work to full
completion in the manner and time required by these Specifications.
All workers shall have sufficient skill and experience to perform properly the work assigned to them. Workers engaged in
special or skilled work shall have sufficient experience in such work and in the operation of the equipment required to
perform all work properly and satisfactorily.
Any person employed by the Contractor or by any Subcontractor who the Engineer determines does not perform work in a
proper and skilled manner or is intemperate or disorderly shall, at the written request of the Engineer, be removed forthwith
Page 3
Section 108-Prosecution and Progress
by the Contractor or Subcontractor employing such person, and shall not be employed again in any portion of The Work
without the approval of the Engineer.
Should the Contractor fail to remove such person or persons as required above, or fail to furnish suitable and sufficient
personnel for the proper prosecution of The Work, the Engineer may suspend The Work by written notice until such orders
are complied with.
All equipment that is proposed to be used on The Work shall be of sufficient size and in such mechanical condition as to
meet the requirements of The Work and to produce a satisfactory quality of work. Equipment used on any portion of the
Project shall be such that no injury to the roadway, adjacent property, or other highways will result from its use.
When the methods and equipment to be used by the Contractor in accomplishing the construction are not prescribed in the
Contract, the Contractor is free to use any methods or equipment that he demonstrates to the satisfaction of the Engineer will
accomplish The Work in conformity with the requirements of the Contract.
When the Contract specifies that the construction be performed by the use of certain methods and equipment, such methods
and equipment shall be used unless others are authorized by the Engineer. If the Contractor desires to use a method or type of
equipment other than those specified in the Contract, he may request authority from the Engineer to do so. The request shall
be in writing and shall include a full description of the methods and equipment proposed to be used and an explanation of the
reasons for desiring to make the change. If approval is given, it will be on the condition that the Contractor will be fully
responsible for producing construction work in conformity with Contract requirements. If, after trial use of the substituted
methods or equipment, the Engineer determines that the work produced does not meet Contract requirements, the Contractor
shall discontinue the use of the substitute method or equipment and shall complete the remaining construction with the
specified methods and equipment. The Contractor shall remove the deficient work and replace it with work of specified
quality, or take such other corrective action as the Engineer may direct. No change will be made in basis of payment for the
construction items involved nor in Contract Time as a result of authorizing a change in methods or equipment under these
provisions.
108.06 Temporary Suspension of Work
The Engineer has the authority to suspend The Work wholly or in part, for as long as he may deem necessary, because of
unsuitable weather, or other conditions considered unfavorable for continuing The Work, or for as long as he may deem
necessary by reason of failure of the Contractor to carry out orders given, or to comply with any provisions of the Contract.
No additional compensation will be paid the Contractor because of suspension. If it becomes necessary to stop The Work for
an indefinite period, the Contractor shall store all materials in such a way that they will not impede the traveling public
unnecessarily or become damaged in any way, and he shall take every precaution to prevent damage or deterioration of The
Work done; provide suitable drainage of the roadway, and erect temporary structures where necessary. The Work shall be
resumed when conditions are favorable or when corrective measures satisfactory to the Engineer have been applied; when,
and as ordered by the Engineer in writing. The Contractor shall not stop The Work without authority.
If The Work is stopped by any temporary or permanent injunction, court restraining order, process or judgment of any kind,
directed to either of the parties hereto, then such period or delay will not be charged against the Contract Time nor shall the
Department be liable to the Contractor on account of such delay or termination of work.
108.07 Determination of Contract Time
The definition of Contract Time and when Contract Time officially begins is stated in Subsection 101.19. After the Contract
has been signed by all parties, Contract Time becomes the specified period of time, agreed upon by the Contractor, the
Surety, and the Department, during which all Items and quantities of work set forth in the Proposal and included in the
original Contract will be completed.
A. Available Day Contracts
An available day is defined in Subsection 101.04. The Engineer will furnish the Contractor a written monthly statement
showing the total number of available days charged through the preceding month. The Contractor will be allowed one
Page 4

With GovernmentContracts, you can:
...Project: CONSTRUCTION TIME AND MATERIALS Ref. #: RFP 27-261110 Type: RFP Status: Open ...
Paulding County School District
Bid Due: 12/10/2026
...CONSTRUCTION TIME AND MATERIALS Paulding County School District Nov 10, 2026 @ 09:31 ...
State Government of Georgia
Bid Due: 12/10/2026
...Construction Manager at Risk (CMAR) Preconstruction and Construction Services for Middle Oconee WRF... ...
State Government of Georgia
Bid Due: 12/17/2026
...Follow Prefabrication Training Venues and Construction Supplies Active Contract Opportunity Notice...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 12/29/2026