| Location: | Hawaii |
|---|---|
| Posted: | Mar 19, 2026 |
| Due: | Mar 25, 2026 |
| Agency: | General Contractors Association |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project Description: The project shall in general consist of, but is not limited to, installation, rehabilitation, and upgrades to the sewer lines at Coconut Island. The scope of work includes the following: selective demolition; salvage of materials and equipment; pump stations and control systems, laterals; coat existing concrete wetwell; submersible pumps including all mechanical, electrical, structural components, and accessories; float or level control devices, piping and accessories; temporary wetwell; low pressure main and force main; gravity sewer lines; sewer manholes; wooden railing repair; tree removal and relocation; erosion control BMPs; concrete perimeter wall and pad, concrete reinforcement, cast-in-place concrete; roof shelter; providing a certified arborist and certified archaeologist; and miscellaneous related work, as shown on the Plans and Technical Specifications.
| Download |
|
Plans
Specifications
|
Addendums/Amendments
B2026000038 - Addendum No. 2.pdf
|

With GovernmentContracts, you can:
...Day Date Time Area ADD/ / AMD GCA# Project 06/08/26 4:00pm Hawaii 35919-284 ...
General Contractors Association
Bid Due: 6/08/2026
...Follow Kona Vet Center Relocation Active Contract Opportunity Notice ID 36C24W26R0007 Related...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/22/2026
...Day Date Time Area ADD/ / AMD GCA# Project 07/07/26 5:00pm Kauai 36032-376 ...
General Contractors Association
Bid Due: 7/07/2026
...Follow Kona Vet Center Relocation Active Contract Opportunity Notice ID 36C24W26R0007 Related...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/08/2026