Project Description: The Base Bid includes the conversion of an existing dry detention basin into an infiltration basin Best Management Practice (BMP). The work will address impairments to the Little Neshaminy Creek Watershed by reducing sediment pollutant loading. Construction will occur in Township easements and rights-of-way. In general, the work consists of, but is not limited to: site clearing, excavation, tree removal, outfall structure installation, rip rap apron installation, sediment forebay installation, grading, soil amendments, storm pipe replacements, concrete endwall replacement, asphalt pavement restoration, concrete sidewalk restoration, concrete curb restoration, landscaping, and erosion and sediment controls.

With GovernmentContracts, you can:
...piping and supports. * Installation of concrete slabs and pads, pre-cast concrete walls, ...
PennBid
Bid Due: 6/19/2026
...includes the construction of 871 linear feet of concrete sidewalk, 4 ADA curb ...
PennBid
Bid Due: 7/07/2026
...curb ramps, concrete driveway aprons, pavement mill and overlay resurfacing, asphalt pavement base... ...
PennBid
Bid Due: 6/12/2026
...for replacement of existing CMP with SLCPP, associated pavement, concrete curb and sidewalk ...