| Location: | Pennsylvania |
|---|---|
| Posted: | Dec 22, 2024 |
| Due: | Jan 10, 2025 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Warminster Municipal Authority, Bucks County |
| Publication URL: | To access bid details, please log in. |
Project Description: The Base Bid includes the conversion of an existing dry detention basin into an infiltration basin Best Management Practice (BMP). The work will address impairments to the Little Neshaminy Creek Watershed by reducing sediment pollutant loading. Construction will occur in Township easements and rights-of-way. In general, the work consists of, but is not limited to: site clearing, excavation, tree removal, outfall structure installation, rip rap apron installation, sediment forebay installation, grading, soil amendments, storm pipe replacements, concrete endwall replacement, asphalt pavement restoration, concrete sidewalk restoration, concrete curb restoration, landscaping, and erosion and sediment controls.

With GovernmentContracts, you can:
...of the installation of sidewalk and concrete upright curb; roadway restoration; driveway tie-ins...; ...
PennBid
Bid Due: 6/26/2026
...to, the demolition and removal of an existing 42" CMP culvert pipe and ...
PennBid
Bid Due: 7/03/2026
...Follow Tionesta Dam Control Tower Concrete Repair Active Contract Opportunity Notice ID... Service ...
DEPT OF DEFENSE
Bid Due: 6/23/2026
...piping and supports. * Installation of concrete slabs and pads, pre-cast concrete walls, ...
PennBid
Bid Due: 6/19/2026