| Location: | Connecticut |
|---|---|
| Posted: | Sep 21, 2025 |
| Due: | Oct 8, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2025-IFB-273 |
| Publication URL: | To access bid details, please log in. |
This project will bring new water service, via new street tap, to the park for the purposes of creating a new splash pad and installing a new drinking fountain with integrated hose bibb. The work will also involve new pathways, drainage improvements in the form of a rain garden, piping, and connection to existing storm drain, and installation of swing set and accompanying engineered wood fiber safety surfacing.
Shawn Garris 200 Orange Street New Haven CT, 06510 United States Tel: 203-946-8202 Fax: sgarris@newhavenct.gov

With GovernmentContracts, you can:
...of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two ...
State Government of Connecticut
Bid Due: 9/08/2026
..., CT) includes but is not limited to earthwork and storm drainage associated ...
State Government of Connecticut
Bid Due: 9/01/2026
...but is not limited to earthwork and storm drainage associated with the construction ...
City of Meriden
Bid Due: 9/01/2026