| Location: | Texas |
|---|---|
| Posted: | Dec 7, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU-25 519 |
| Publication URL: | To access bid details, please log in. |
Project Description: Improvement Component 1 (IC1) includes three major design elements. (1) Filtered Water Flume, Junction Box and Access Building, (2) Thickened Residuals Sludge Line and (3) Backwash Tanks. This work package represents the first of 3 design elements that includes a concrete flume and connections to existing facilities, a junction box with multiple gates, a flume access building, yard piping and structures, mechanical piping, and electrical infrastructure as defined in the Contract Documents and Delineation Drawings.
Information regarding this project may be found by visiting the Construction Manager at Risk's (Archer Western Construction) procurement site (Civcast) the following link:
https://www.civcastusa.com/project/691243dea6f65e1dce83e77c/summary
Project Manager: Eva Gorgi; Email: eva.gorgi@dallas.gov

With GovernmentContracts, you can:
...SLUDGE TRANSPORTATION AND DISPOSAL Solicitation ID: RFB2026-10-01Sludge Due Date: 7/9/2026 Due...
State Government of Texas
Bid Due: 7/09/2026
...) Return activated sludge (RS) and waste activated sludge (WS) pump station; (7) ...
City of Fort Worth
Bid Due: 6/25/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable...
City of Dallas
Bid Due: 7/10/2026
...water and debris at three (3) Sludge Tanks located at the Lubbock, Abernathy, ...
State Government of Texas
Bid Due: 6/16/2026