| Location: | Texas |
|---|---|
| Posted: | Dec 7, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU-25 521 |
| Publication URL: | To access bid details, please log in. |
Project Description: Improvement Component 1 (IC1) includes three major design elements. (1) Filtered Water Flume, Junction Box and Access Building, (2) Thickened Residuals Sludge Line and (3) Backwash Tanks. This work package represents the second of 3 design elements that includes installation of yard piping, support of existing utilities, tie-in coordination and replacement of concrete pavement as defined in the Contract Documents and Delineation Drawings.
https://www.civcastusa.com/project/6914f777a6f65e8818eef24f/summary
Project Manager: Eva Gorgi, Email: eva.gorgi@dallas.gov

With GovernmentContracts, you can:
Bid Information Type Competitive Sealed Proposal Status Issued Number 26-029 (Districtwide Water Treatment
El Paso Independent School District
Bid Due: 7/01/2026
Bid Number: CSJ: 0081-03-069 Bid Title: Green Ribbon FY26 Median Improvements Category: Bids
Roanoke city
Bid Due: 6/29/2026
Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date
City of College Station
Bid Due: 7/09/2026
Project: Semi-Automatic Weapons Exchange Ref. #: BU26-00030264 Type: RFB Status: Open Open Date:
City of Dallas
Bid Due: 6/26/2026