| Location: | Texas |
|---|---|
| Posted: | Dec 7, 2025 |
| Due: | Dec 17, 2025 |
| Agency: | City of Dallas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | CIZ-DWU-25 521 |
| Publication URL: | To access bid details, please log in. |
Project Description: Improvement Component 1 (IC1) includes three major design elements. (1) Filtered Water Flume, Junction Box and Access Building, (2) Thickened Residuals Sludge Line and (3) Backwash Tanks. This work package represents the second of 3 design elements that includes installation of yard piping, support of existing utilities, tie-in coordination and replacement of concrete pavement as defined in the Contract Documents and Delineation Drawings.
https://www.civcastusa.com/project/6914f777a6f65e8818eef24f/summary
Project Manager: Eva Gorgi, Email: eva.gorgi@dallas.gov

With GovernmentContracts, you can:
...SLUDGE TRANSPORTATION AND DISPOSAL Solicitation ID: RFB2026-10-01Sludge Due Date: 7/9/2026 Due...
State Government of Texas
Bid Due: 7/09/2026
...) Return activated sludge (RS) and waste activated sludge (WS) pump station; (7) ...
City of Fort Worth
Bid Due: 6/25/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable...
City of Dallas
Bid Due: 7/10/2026
...water and debris at three (3) Sludge Tanks located at the Lubbock, Abernathy, ...
State Government of Texas
Bid Due: 6/16/2026