| Location: | Utah |
|---|---|
| Posted: | Jul 21, 2026 |
| Due: | Aug 14, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 1240LT26Q0099 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
This project consists of the reroofing of the historic UTE Tower on the Ashley National Forest.
B. Work includes:
1. Remove and dispose of existing cedar wood shingle roofing system.
2. The existing plywood sheathing to remain.
3. Remove & reinstall the lightning protection rod, lightning protection cables across the
roof, clamps & fasteners across the roof, and appurtenances across the roof.
4. Install a multi-width synthetic cedar shingle roofing system as specified in Specification
Section 073129 SYNTHETIC CEDAR SHINGLES, and as per manufacturer’s
instructions, to include matching synthetic cedar ridge caps on each of the 4 ridges.
5. Work includes the installation of the roofing felt and self-adhering ice shield
underlayment over the entire roof, the flashing, the synthetic shingles, the synthetic
ridge caps, and all necessary fasteners and accessories. Flashing shall be galvanized
steel, no sheen, mill finish.
6. Metal Work: Fabricate and install a matching stove pipe sleeved flashing piece, to
match existing material and dimensions. Within that new sleeved flashing piece,
reinstall the salvaged stove pipe w/ flashing to match

With GovernmentContracts, you can:
...contractor for the installation of approximately 260' of 8" fused DR21 HDPE pipe ...
State Government of Utah
Bid Due: 9/15/2026