| Location: | Federal |
|---|---|
| Posted: | Sep 9, 2026 |
| Due: | Sep 9, 2026 |
| Agency: | NATIONAL AERONAUTICS AND SPACE ADMINISTRATION |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 80NSSC26942555Q |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Q&A
1. What is the required quantity?
One
2. Please confirm the exact delivery address and required delivery date or lead-time requirement. The RFQ states FOB Destination but does not identify the destination address or schedule.
21000 Brookpark Rd
Building 301 Dock
Cleveland, OH 44135
3. Is the requirement limited to supply and delivery, or are installation, integration, testing, commissioning, removal, training, or on-site technical support required?
Supply & delivery only
4. Please confirm whether either listed brand-name model is acceptable when configured exactly to the stated specifications: Ebara EMT2400-MBWB or Osaka TG2400-MBWB.
Yes
5. Please provide any required technical data sheets, country-of-origin information, warranty terms, packing/shipping instructions, and acceptance criteria not included in the RFQ.
Standard factory warranty terms shall be honored. Packing shall be of sufficient quality to protect from damage during transit.
6. Please confirm whether any bonding, insurance, licensing, cybersecurity, facility-access, export-control, or site-visit requirements apply to this purchase.
No
7. Please confirm whether manufacturer pricing proof and reseller authorization may be provided as manufacturer/distributor letters attached to the quotation.
I am not familiar with this question.
8. Please confirm whether the Government has identified a specific controller, connector, cable, inlet screen, air-cooling kit, or water-cooling configuration beyond the specifications in Section 1.
Turbopump with air and water cooling kit, inlet screen and cable only. No controller is needed. If needed, the controller can be removed from the SOW.
| Sep 1, 2026 | [Combined Synopsis/Solicitation (Original)] New Turbo Molecular High Vacuum Pump for Vacuum Facility 6 |

With GovernmentContracts, you can:
...Follow Cable Assembly Active Contract Opportunity Notice ID SPE4A626R0311 Related Notice...
DEPT OF DEFENSE
Bid Due: 10/21/2026
...Follow CABLE ASSEMBLY Active Contract Opportunity Notice ID N0010426QBV84 Related Notice..., 2026 Initiative: ...
DEPT OF DEFENSE
Bid Due: 10/09/2026
...Follow Cable Assembly Active Contract Opportunity Notice ID SPE4A626R0315 Related Notice...: 5995 - ...
DEPT OF DEFENSE
Bid Due: 9/28/2026
...Follow CABLE ASSY LAUNCHER Active Contract Opportunity Notice ID N0010426QNE71 Related Notice... Set ...
DEPT OF DEFENSE
Bid Due: 10/05/2026