State of Minnesota
REQUEST FOR PROPOSALS (RFP)
PART A: INSTRUCTIONS AND CONTENT
In-Depth Cost Analysis of Liquid and Solid Deicing Materials
MnDOT Contract Number: 1063983
Date Posted: 08/12/2026
1. Responses must be received by MnDOT no later than 2:00 pm Central Time, on 09/29/2026. Late responses will
not be considered.
2. This document is available in alternative formats for persons with disabilities by calling Michael Friberg at 651-
366-4683 or for persons who are hearing, or speech impaired by calling the Minnesota Relay Service at 1-800-
627-3529. For other information on disability rights and protections, contact MnDOT’s Americans with
Disabilities Act (ADA) Coordinator.
3. Responder must also complete and submit PART B of this Request for Proposals, posted separately from this
document.
4. As of July 1, 2025, certain terms are unenforceable in state contracts. See Minnesota Statutes §16C.05
subdivision 8.
Minnesota’s Commitment to Diversity and Inclusion
The State of Minnesota is committed to diversity and inclusion in its public procurement process. The goal is to
ensure that those providing goods and services to the State are representative of our Minnesota communities
and include businesses owned by minorities, women, veterans, and those with substantial physical disabilities.
Creating broader opportunities for historically under-represented groups provides for additional options and
greater competition in the marketplace, creates stronger relationships and engagement within the State’s
communities, and fosters economic development and equality.
To further this commitment, the Department of Administration operates a program for Minnesota-based small
businesses owned by minorities, women, veterans, and those with substantial physical disabilities. For additional
information on this program, or to determine eligibility, please call 651-296-2600 or go to
www.mmd.admin.state.mn.us/mn02001.html.
SPECIAL NOTICE: This is a request for proposal. It does not obligate MnDOT to award a contract or complete the
proposed program, and MnDOT reserves the right to cancel this RFP if it is considered in its best interest.
(CSS/CM Last Updated: 06/09/2026)
Request For Proposal Part A Contents
TABLE OF CONTENTS
SECTION 1 – INSTRUCTIONS TO RESPONDERS
SECTION 2 – SUMMARY OF PROJECT SCOPE
SECTION 3 – PROPOSAL INSTRUCTIONS AND ADDITIONAL INFORMATION
SECTION 4 – PROPOSAL CONTENT AND SUBMISSION
SECTION 5 – EVALUATION PROCEDURE AND CRITERIA
SECTION 6 – TERMS AND GENERAL REQUIREMENTS
Request For Proposal Required Forms and Declarations (see PART B, posted seperately):
1. Attachment 1: Responder Declarations & Certifications
2. Attachment 2: Exceptions to MnDOT's Terms and Conditions Form
3. Attachment 3: Responder Forms
a. Workforce and Equal Pay Declaration Form
b. Conflict of Interest Checklist and Disclosure Form
c. Resident Vendor Form
d. Link to the Federal Disclosure Form to Report Lobbying (Standard Form-LLL)
THE BALANCE OF THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
(CSS/CM Last Updated: 06/09/2026)
2
Steps for
Completing
Your Response
Incomplete
Submittals
How to Ask
Questions
SECTION 1 – INSTRUCTIONS TO RESPONDERS
Follow the steps below to complete your response to this RFP:
Step 1: Read the solicitation documents and ask questions, if any
Step 2: Write your Proposal and complete the required Forms in Part B of this RFP
Step 3: Submit your Proposal
A Proposal must be submitted along with any required additional documents. Incomplete
Proposals that materially deviate from the required format and content may be rejected.
STEP 1 – READ THE SOLICITATION DOCUMENT & ASK QUESTIONS, IF ANY
The Instructions for Questions and Answers section is in this link to Section 3. The contact person
for questions is:
Michael Friberg, Contract Administrator
Michael.friberg@state.mn.us
How to Write
your Response
Use the following as the subject line of your email: MnDOT Contract No. 1063983, In-Depth Cost
Analysis of Liquid and Solid Deicing Materials. Questions must be emailed to the contact person
and received by 2:00 pm Central Time, on 09/15/2026. Other personnel are not authorized to
answer questions regarding this RFP.
STEP 2 – WRITE YOUR RESPONSE
The Proposal Content section is in this link to Section 4. Prepare a written response and supply
all requested content. Proposals must address the requested information and documents
detailed in Section 4 or be disqualified as non-responsive.
All Proposals submitted in response to this RFP will be public information under the Minnesota
Government Data Practices Act, Minnesota Statutes Chapter 13 once the evaluation process is
complete.
Where to Send
Your Response
and
Confirmation
Make sure to review and sign your Proposal and include all necessary Part B Attachments.
STEP 3 –SUBMIT YOUR RESPONSE
Proposals must be electronically submitted via e-mail to:
Michael Friberg, Contract Administrator
Michael.friberg@state.mn.us
Use the following as the subject line of your email: MnDOT Contract No. 1063983, In-Depth Cost
Analysis of Liquid and Solid Deicing Materials. You must copy:
ProfessionalTechnicalContractForms.dot@state.mn.us on the email.
Proposals must be received by MnDOT no later than 2:00 pm Central Time, on 09/29/2026. Late
responses will not be considered.
You will receive a confirmation email from MnDOT after submission. If you do not, please email
the Contract Administrator above to ensure your response was received.
By signing and submitting a Proposal, you are making a binding legal offer for the period of time
listed here. This Condition of Offer is discussed in more detail in the Terms & General
Requirements section of this RFP, Section 6.
(CSS/CM Last Updated: 06/09/2026)
3
SECTION 2 –SUMMARY OF PROJECT SCOPE
1. Project Overview and Goals
This project has been developed by Clear Roads. Clear Roads is an ongoing pooled fund research project aimed at
rigorous testing of winter maintenance materials, equipment and methods for use by highway maintenance crews. Clear
Roads will fund and oversee the contract for this project in coordination with MnDOT. For more information, visit
www.clearroads.org.
MnDOT requests responses for this Clear Roads project to build on existing research on the benefits of incorporating
liquids deicers into snow-and-ice operations to establish a tool that calculates and compares the comprehensive costs of
applying liquid and solid deicing materials. Whereas related Clear Roads projects 23-02 and 22-04 examined the benefits
of snow-and-ice operations, this project will focus on developing an Excel tool to calculate actual costs for liquid and
solid deicing materials applied to the roadway on a per unit basis. This would allow transportation agencies that mange
winter maintenance to accurately estimate the needed investment and resources for liquid deicing infrastructure to
maximize winter maintenance efforts and ensure the cost-effective use of maintenance funds.
The tool should account for all associated costs of applying liquid and solid deicing materials including raw material
costs, labor (administrative and operations), facility construction and operations, brine production, application
equipment, loading equipment, maintenance, etc.
Project Goal
The primary goal of this project is to enable agencies to calculate and document the comprehensive costs associated
with applying liquid and solid deicing materials by developing an Excel spreadsheet that would enable a state to input
costs to calculate costs associated with solid and liquid material applications on a per unit basis. The results should
provide DOTs with accurate estimates and comparisons in their efforts to make thoughtful and appropriate investments
into liquid deicing infrastructure and maximize the expenditure of maintenance funds to achieve the safety and
operational mission of snow-and-ice operations.
2. Scope of Work and Deliverables
The selected vendor is expected to thoroughly review current literature and industry practices, survey and interview
Clear Roads members and work with the Clear Roads subcommittee overseeing the project to incorporate feedback and
suggestions that maximize the usefulness and convenience of the cost-calculating Excel tool.
Investigators will develop an Excel spreadsheet tool that calculates the comprehensive costs of applying liquid and solid
deicing materials based on the user input of state or district-level costs.
Investigators will also create a one-page Fact Sheet that illustrates and promotes the functionality of the tool, such as
comparing the costs of using liquid deicers versus salt.
To create the tool, investigators will:
1. Conduct an extensive literature / industry review, distribute a survey and conduct interviews to identify and
document all cost items associated with applying liquid and solid deicing materials.
2. Develop a methodology, to be used to insert formulas and functions into Excel spreadsheet cells, to quantify
costs on a per unit basis (such as per gallon, per ton, etc.). These materials are often applied together, and the
methodology should account for the likely use of both.
3. Make recommendations that clearly identify the costs that will be included and calculated in the Excel tool.
4. Incorporate feedback and suggested revisions into a final version of the cost-calculating Excel tool and
accompanying user’s guide.
(CSS/CM Last Updated: 06/09/2026)
4
Tasks
Responders should detail their approach to this project and outline the steps they would take to achieve the project’s
goals and anticipated deliverables.
Anticipated Deliverables
The following is a list of deliverables expected to be provided by the successful responder:
1. Kick-off teleconference at the start of the project to review project tasks and goals and discuss the plans for all
of the tasks.
2. Check-in teleconferences with Clear Roads to review deliverables as appropriate.
3. Identification of cost items. Literature and industry reviews, survey of Clear Roads member states and follow-up
interviews to identify the comprehensive costs transportation agencies incur with the use and application of
liquid and solid deicing materials. The task deliverable will be a set of draft survey questions and a memo
summarizing findings, including the cost items to be included in the Excel Tool.
4. Develop a methodology. Based on the identified cost items to include in the Excel tool, develop a methodology
for calculating costs using formulas and functions for use in within the Excel spreadsheet to quantify costs on a
per unit basis(such as per gallon, per ton, etc.). The task deliverable will be a draft memo that summarizes the
proposed structure and functionality of the Excel tool.
5. Excel tool and user’s guide. Develop a Beta version of the cost-calculating Excel tool and user’s guide for testing
by Clear Roads member states. Collect feedback and make suggested revisions to the tool and user’s guide. The
task deliverable will be a Beta and final version of the Excel tool and user’s guide and a memorandum
summarizing the subcommittees suggested revisions and how those changes were made to the tool and user’s
guide.
6. Fact Sheet. The task deliverable will be a fact sheet that illustrates and promotes the functionality of the tool.
7. Final report. Document the research methodology and findings. The report will include an executive summary
and details of each task.
8. PowerPoint file to support presentations at conferences or national and regional meetings by Clear Roads
members regarding the use and benefits of the cost-calculating Excel tool.
9. Virtual webinar to present project findings including a demonstration of the tool to show a cost comparison
using example price data.
10. Quarterly Reports that provide documentation of progress should be submitted to the Clear Roads Technical
Advisory Committee (TAC) at the end of each quarter of the year (March 31, June 30, September 30, December
31) for the duration of the contract.
3. Additional Tasks or Activities.
Responders are encouraged to propose additional tasks or activities if they will substantially improve the results of
this Project. These items must be separated from the required items on the cost proposal required under this RFP.
THE BALANCE OF THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK
(CSS/CM Last Updated: 06/09/2026)
5
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.