| Location: | North Carolina |
|---|---|
| Posted: | Nov 10, 2025 |
| Due: | Dec 8, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 131-70141 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 131-70141 |
| Project Title: | Wayne Community College - MASTER METER AND BOOSTER PUMP ADDITION |
| Description: | Wayne Community College is seeking proposals for a project which includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approximately 250 LF of water main off of Wayne Community College Entrance Drive, an addition of nine, 10-inch isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main. |
| Opening Date: | 12/8/2025 2:00 PM |
| Posted Date: | 11/11/2025 |
| Status: | Open |
| Department: | WAYNE COMMUNITY COLLEGE |
|
Solicitation Number
*
131-70141
|
Department
WAYNE COMMUNITY COLLEGE
|
Status Reason
Open
|
|
|
Opening Date
2025-12-08T14:00:00.0000000
|
Posted Date
*
2025-11-10T19:13:05.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
OPTIONAL pre-bid meeting Wednesday, November 19, 2025 at 10:00 AM
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Owner
Noelle Woods
|
|||
|
Description
Wayne Community College is seeking proposals for a project which includes the addition of a master meter, master back flow preventer, and packaged domestic and fire booster pump system and shelter. This addition also includes an extension of approximately 250 LF of water main off of Wayne Community College Entrance Drive, an addition of nine, 10-inch isolation valves, installation of a bypass check valve and vault, connection of the packaged booster system to existing power, site/pavement repairs, implementation of required erosion and sediment control measures, installation and maintenance of traffic control, and the connection to existing private water main.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...Back Flow Devices Event: 12382-0 Reference: Water Resources Type: INFORMAL BID Open Date: ...
City of Greensboro
Bid Due: 6/25/2026
...of the WTP; with Lagoon 2 receiving the vast majority of this flow. ...
City of Durham
Bid Due: 6/12/2026
...surface flow and unnamed tributaries to Stirrup Iron Creek, which has a NC ...
State Government of North Carolina
Bid Due: 6/25/2026