| Location: | Texas |
|---|---|
| Posted: | Nov 26, 2024 |
| Due: | Dec 19, 2024 |
| Agency: | City of Frisco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2510-007 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construct variable width frontage road pavement widening, bridge widening and pavement panel replacement for a 2.5 mile length along the northbound and southbound side of the Dallas North Tollway corridor from south of Panther Creek Parkway to PGA Parkway. Work includes but is not limited to grading, paving, drainage, bridge, pavement markings/signage, traffic signal, pavers, electrical and architectural lighting. All roadway, sidewalk and bridge work must be complete, and all lanes open to traffic for Milestone 1 within 300 calendar days and in final contract condition (Milestone 2) within 365 calendar days. Liquidated damages of $2,000/day will be assessed after 300 calendar days if CONTRACTOR fails to meet the Milestone 1 requirement and $2,000/day after 365 calendar days if CONTRACTOR fails to meet the Milestone 2 requirement.

With GovernmentContracts, you can:
RFP FOR THE COLLECTION OF FEES OWED FOR THE DRIVERS RESPONSIBILTY PROGRAM Agency:
State Government of Texas
Bid Due: 6/22/2040
BIRMINHAM HEAVY DUTY SHEAR #CPTH-0865 OR EQUAL. Agency: TEXAS DEPARTMENT OF TRANSPORTATION Open
State Government of Texas
Bid Due: 11/22/2042
RFP/RFCSP # Description Opening, Date and Time Buyer 14-056 On Line Auction www.lonestarauctioneers.com
Fort Worth Independent School District
Bid Due: 11/15/2029
Title Start Date End Date RFP #8711 - Precision Metal Equipment Equipment for
Lubbock Independent School District
Bid Due: 7/16/2068