| Location: | Texas |
|---|---|
| Posted: | Nov 26, 2024 |
| Due: | Dec 19, 2024 |
| Agency: | City of Frisco |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2510-007 |
| Publication URL: | To access bid details, please log in. |
Project Description: Construct variable width frontage road pavement widening, bridge widening and pavement panel replacement for a 2.5 mile length along the northbound and southbound side of the Dallas North Tollway corridor from south of Panther Creek Parkway to PGA Parkway. Work includes but is not limited to grading, paving, drainage, bridge, pavement markings/signage, traffic signal, pavers, electrical and architectural lighting. All roadway, sidewalk and bridge work must be complete, and all lanes open to traffic for Milestone 1 within 300 calendar days and in final contract condition (Milestone 2) within 365 calendar days. Liquidated damages of $2,000/day will be assessed after 300 calendar days if CONTRACTOR fails to meet the Milestone 1 requirement and $2,000/day after 365 calendar days if CONTRACTOR fails to meet the Milestone 2 requirement.

With GovernmentContracts, you can:
...and installation of garage doors, replacement of lighting, ceiling grids/tiles, personnel doors...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026
...project for work that requires demolition and installation of garage doors, replacement of ...
INTERIOR, DEPARTMENT OF THE
Bid Due: 6/22/2026