| Location: | Arizona |
|---|---|
| Posted: | Jul 20, 2026 |
| Due: | Aug 20, 2026 |
| Agency: | City of Scottsdale |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27IFB097 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of the construction of roadway, bridge, drainage, striping and signage improvements to Thompson Peak Parkway at the Reata Pass Wash. The improvements include but are not limited to bridge abutment and pier drilled shaft foundations, bridge substructure and superstructure, retaining walls, roadway paving, concrete curb, gutter, and sidewalk, a stabilized shared-use path, grading and drainage, signing and marking, landscape and irrigation, and bridge stone façade aesthetic treatments.

With GovernmentContracts, you can:
.... Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026
...gallon oil and water separator. Civil site improvements consists of grading, drainage, utilities...
City of Prescott
Bid Due: 12/10/2026
.... Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 11/17/2026