| Location: | Arizona |
|---|---|
| Posted: | Jul 20, 2026 |
| Due: | Aug 20, 2026 |
| Agency: | City of Scottsdale |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27IFB097 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of the construction of roadway, bridge, drainage, striping and signage improvements to Thompson Peak Parkway at the Reata Pass Wash. The improvements include but are not limited to bridge abutment and pier drilled shaft foundations, bridge substructure and superstructure, retaining walls, roadway paving, concrete curb, gutter, and sidewalk, a stabilized shared-use path, grading and drainage, signing and marking, landscape and irrigation, and bridge stone façade aesthetic treatments.

With GovernmentContracts, you can:
...including grading and drainage improvements, utility adjustments, lighting and signage improvements...
City of Prescott
Bid Due: 9/24/2026
...and reconstruction of an existing headwall. Additional drainage work includes ditch grading...
TRANSPORTATION, DEPARTMENT OF
Bid Due: 9/30/2026