| Location: | Arizona |
|---|---|
| Posted: | Jul 20, 2026 |
| Due: | Aug 20, 2026 |
| Agency: | City of Scottsdale |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 27IFB097 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Project consists of the construction of roadway, bridge, drainage, striping and signage improvements to Thompson Peak Parkway at the Reata Pass Wash. The improvements include but are not limited to bridge abutment and pier drilled shaft foundations, bridge substructure and superstructure, retaining walls, roadway paving, concrete curb, gutter, and sidewalk, a stabilized shared-use path, grading and drainage, signing and marking, landscape and irrigation, and bridge stone façade aesthetic treatments.

With GovernmentContracts, you can:
..., street lighting, landscaping and irrigation, utility work and drainage facilities. Timeline Issue...
City of Tucson
Bid Due: 9/21/2026
...IRRIGATION AND WATER CONTROL EQUIPMENT, Rio de Flag Flood Risk Management Project, Flagstaff...
DEPT OF DEFENSE
Bid Due: 9/21/2026
...and irrigation, utility work and drainage facilities. Timeline Issue Date: August 19, 2026 ...
City of Tucson
Bid Due: 10/05/2026
...Description SPECIAL NOTICE-SOURCES SOUGHT FOR BRAND-NAME IRRIGATION AND WATER CONTROL EQUIPMENT, Rio de...
DEPT OF DEFENSE
Bid Due: 9/21/2026