Project Description: Improvement Component 1 (IC1) includes three major design elements. (1) Filtered Water Flume, Junction Box and Access Building, (2) Thickened Residuals Sludge Line and (3) Backwash Tanks. This work package represents the second of 3 design elements that includes installation of yard piping, support of existing utilities, tie-in coordination and replacement of concrete pavement as defined in the Contract Documents and Delineation Drawings.
https://www.civcastusa.com/project/6914f777a6f65e8818eef24f/summary
Project Manager: Eva Gorgi, Email: eva.gorgi@dallas.gov

With GovernmentContracts, you can:
...Project: Replace Double Membrane Gas Containment at SEWRP Sludge Holding Ref. #: RFP ...
City of Lubbock
Bid Due: 7/23/2026
...And Drainage Imp. Summary: The anaerobic digestion process to treat wastewater sludge produces...
City of Austin
Bid Due: 8/06/2026
...traps at various locations throughout the city. Applicable Product Categories: 910-70 Sludge Removal...
City of San Antonio
Bid Due: 7/24/2026