SECTION 00 01 10
TABLE OF CONTENTS
VOLUME 1 OF 2
Section
PART I - BIDDING DOCUMENTS
00 11 13
00 21 13
00 41 00
00 43 14
00 45 30
00 51 00
00 52 13
00 55 00
00 61 14
00 61 15
00 62 76
00 63 36
00 63 49
00 63 63
00 65 16
00 65 18
Invitation to Bid
Instructions to Bidders
Bid Form
Bid Bond (Penal Form)
E-Verify Agreement and Affidavit
Notice of Award
Agreement
Notice to Proceed
Performance Bond
Payment Bond
Contractor’s Application for Payment
Field Order Form
Work Change Directive
Change Order
Certificate of Substantial Completion
Notice of Acceptability of Work
PART II - CONDITIONS OF THE CONTRACT
00 70 00 General Conditions
00 73 00 Supplemental General Conditions
Section
PART III - TECHNICAL SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00
01 14 33
01 20 00
01 25 10
01 31 30
01 32 16
01 33 20
01 41 26
01 45 00
01 50 10
01 57 19
01 71 00
01 77 00
01 78 39
Summary of Work
Rights-of-Way
Measurement and Payment
Products, Materials, Equipment and Substitutions
Safety
Construction Progress Schedule
Submittal Procedures
Permits
Quality Control
Site Access and Storage
Temporary Environmental Controls
Mobilization
Project Closeout
Project Record Documents
CITY OF MOAB
SPITFIRE STORM DRAIN IMPROVEMENT PROJECT
This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
TABLE OF CONTENTS
PAGE 00 01 10-1
SECTION 00 11 16
INVITATION TO BID
RECEIPT OF BIDS: Bids will be accepted via Bonfire (https://utah.bonfirehub.com) until 1 p.m.
(MST) September 1st, 2026, for construction of the Spitfire Storm Drain Improvement Project.
Any Bids received after the specified time will not be considered.
All bids must be submitted electronically through the Utah State Procurement Portal. Emailed bids
will not be accepted.
OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled Pack Creek Pedestrian
Bridge Replacement and Channel Restoration Project. An electronic copy of the documents in PDF
format may be downloaded from the Utah State Procurement Portal at https://utah.bonfirehub.com.
A link to the documents can be found on the City’s website (www.moabcity.gov) under the Business
Resources/Bid tab.
DESCRIPTION OF WORK: The scope of this project is to provide all the labor, materials, tools, traffic
control and equipment necessary to construct the Spitfire Storm Drain Improvement Project,
complete as described in the plans and specifications. The project generally includes the following:
to remove existing storm curb inlet, install new double grate storm drain inlet, connect the inlet to
existing storm drain manhole with a HDPE pipe on the street, loop the culinary water main line,
install air release assembly with a faux rock, remove and reinstall concrete path.
SITE OF WORK: The Project Site is located on 100 West Street in the City of Moab, Utah.
MANDATORY PRE-BID MEETING (IN-PERSON and VIRTUAL): A mandatory pre-bid in-person and
virtual meeting will be held at 1 p.m. (MST), August 18th, 2026, at the Moab City Council
Chambers located at 217 East Center Street, Moab, Utah 84532 followed by a site visit.
Prospective Bidders are required to attend. The purpose of the conference is to discuss the scope of
the project, bidding requirements, and to acquaint the bidders with the site conditions. Detailed
technical questions can be submitted in writing and will be formally answered, if warranted, by
addenda at a later time. Oral statements may not be relied upon and will not be legally binding.
Join Zoom Meeting
https://us02web.zoom.us/j/88627767157?pwd=nkwEtTwOojJ0qB8l5tMn9VDKtfHDDV.1
Meeting ID: 886 2776 7157
Passcode: 611857
COMPLETION OF WORK: Time is of the essence.
The following outlines the schedule for The Project based upon award of the project.
A. The Work covered by this Bid Schedule shall be substantially complete within 30
calendar days after the issuance of the Notice to Proceed, at which time the Contract
Times shall commence to run in accordance with Paragraph 4.01 of the General
Conditions. The Work shall be fully completed and ready for final payment, in accordance
with Paragraph 15.06 of the General Conditions, within 45 calendar days after the
issuance of the Notice to Proceed.
CITY OF MOAB
SPITFIRE STORM DRAIN IMPROVEMENT
INVITATION TO BID
PAGE 00 11 16 - 1
B. Time is of the essence. The Owner understands the tight construction schedule for this
project.
OPENING OF BIDS: The Bids will be opened publicly and read at 1 p.m. (MST) September 1st, 2026
at Moab City Council Chambers located at 217 East Center Street, Moab, Utah 84532. Attending
the Bid Opening is not mandatory.
BID SECURITY: Each Bid shall be accompanied by a certified or cashier’s check, or bid bond in the
amount of five percent (5%) of the total bid price payable to the Owner as a guarantee that the Bidder,
if his Bid is accepted, will promptly execute the contract, provide evidence of insurance, and furnish
a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a
payment bond in the amount of 100 percent of the total bid price.
PROJECT ADMINISTRATION: All questions relative to this project prior to deadline for question
shall be submitted through Utah State Procurement Portal https://utah.bonfirehub.com
It shall be understood, however, that no interpretations of the drawings or specifications will be
made except in writing signed by the Engineer, nor will any "or equal" products be considered for
approval prior to award of a contract.
OWNER'S RIGHTS RESERVED: The Owner may, at reasonable times, inspect the part of the plant or
place of business of a contractor or any subcontractor, which is related to the performance of any
contract awarded or to be awarded by the Owner. The Owner reserves the right to reject any or all
Bids, to waive any informality in a Bid, and to make awards in the interest of the Owner.
CITY OF MOAB
SPITFIRE STORM DRAIN IMPROVEMENT
INVITATION TO BID
PAGE 00 11 16 - 2