August 11, 2026
REQUEST FOR PROPOSAL
PORT ARTHUR ECONOMIC DEVELOPMENT CORPORATION (EDC)
SPUR 93 AND JADE AVENUE BUSINESS PARK
LANDSCAPE AND IRRIGATION MAINTENANCE
DEADLINE: Sealed proposal submittals must be received, and time stamped by 10:00 a.m.
Central Standard Time, Wednesday, August 26, 2026. (The clock located in the EDC’s front
lobby desk will be the official time.) All proposals received will be read aloud at 10:15 a.m. on
Wednesday, August 26, 2026 in the Port Arthur EDC’s 1st Floor Conference Room, 501 Procter
Street, Port Arthur, TX. Proposals will be opened in a manner to avoid public disclosure of contents;
however, only the names of proposers will be read aloud.
MARK ENVELOPE: EDC-3
DELIVERY ADDRESS: Please submit one (1) original and three (3) exact duplicate copies of
your RFP to:
PORT ARTHUR EDC
ATTN: CEO
501 PROCTER STREET, SUITE 100
PORT ARTHUR, TEXAS 77640
POINTS OF CONTACT:
Questions concerning the Request for Proposal should be directed in writing to:
Port Arthur EDC
Khanh Ha, Senior Facilities Maintenance
501 Procter Street, Suite 100
Port Arthur, TX 77640
khanh@paedc.org
The enclosed REQUEST FOR PROPOSAL (RFP) and accompanying General Instructions are for
your convenience in submitting proposals for the enclosed referenced services for the EDC.
Proposals must be signed by a person having authority to bind the firm in a contract. Proposals shall
be placed in a sealed envelope, with the Vendor’s name and address in the upper left-hand corner
of the envelope.
ALL PROPOSALS MUST BE RECEIVED IN THE PORT ARTHUR ECONOMIC
DEVELOPMENTS OFFICE BEFORE OPENING DATE AND TIME. It is the sole responsibility
of the firm to ensure that the sealed RFP submittal arrives at the above location by specified deadline
regardless of delivery method chosen by the firm. Faxed or electronically transmitted RFP
submittals will not be accepted.
Krystle Muller
PAEDC CEO
Page 2 of 24
REQUESTS FOR PROPOSALS
PORT ARTHUR ECONOMIC DEVELOPMENT CORPORAITON (EDC)
SPUR 93 AND JADE AVENUE BUSINESS PARK
LANDSCAPE AND IRRIGATION MAINTENANCE
(To be Completed ONLY IF YOU DO NOT BID.)
FAILURE TO RESPOND TO BID SOLICITATIONS FOR TWO (2) BID PERIODS MAY
RESULT IN REMOVAL FROM THE VENDOR’S LIST. However, if you are removed you will
be reinstated upon request.
In the event you desire not to submit a bid, we would appreciate your response regarding the
reason(s). Your assistance in completing and returning this form in an envelope marked with
the enclosed bid would be appreciated.
NO BOD is submitted
At this time only
Not this commodity/service only
Yes
No
Does your company provide this product or services?
Were the specifications clear?
Were the specifications too restrictive?
Does the City pay its bills on time?
Do you desire to remain on the bid list for this product or service?
Does your present workload permit additional work?
Comments/Other Suggestions:
Company Name:
Person Completing Form:
Mailing Address:
City, State, Zip Code:
Telephone:
Email:
Date:
Page 3 of 24
MANDATORY
PRE-BID CONFERENCE
A Mandatory Pre-Bid Conference between Representatives of the EDC, Port Arthur, Texas and
prospective bidders for Spur 93 and Jade Avenue Business Park Landscape and Irrigation
Maintenance will be held at the EDC’s 1st Floor Conference Room, 501 Procter Street, Port
Arthur, Texas on August 18, 2026 @ 10:00 a.m. The purpose of the Mandatory Pre-Bid
Conference is to make certain that the scope of work is fully understood, to answer any questions,
to clarify the intent of the Contract Documents, and to resolve any problems that may affect the
project construction. No addendum will be issued at this meeting, but subsequent thereto, the Deputy
Director, if necessary, will issue an addendum(s) to clarify the intent of the Contract Documents.
Bids received from firms or individuals not listed on the role of attendees of the Mandatory Pre-Bid
Conference will be rejected and returned unopened to the bidder.
Page 4 of 24
Specifications For
Port Arthur Economic Development Corporation
Spur 93 and Jade Avenue Business Park
Landscape and Irrigation Maintenance
Scope of Work:
The contractor shall furnish all supervision, labor, materials, machinery, tools, equipment, fuel, and
service, to perform and complete all work in an efficient and workman-like manner as specified in
the following:
EDC BUSINESS PARK IRRIGATION MAINTENANCE
General Check up every 3 months to include:
• Contractor shall consistently maintain all components of the irrigation system in proper
working order, as per manufactures specifications, by inspection the entire system on as
ongoing basis.
• Adjusting nozzles, rotors, and bubblers for proper coverage.
• Check for leaks in system.
• Check for valves that may be sticking.
• Check filters in pop up sprayers.
• Check control panels for proper times of watering, frayed wires, wasp nest, ants, and overall
condition.
• Check to ensure that all heads and valve covers are at proper height to ensure that no damage
will occur by mowing equipment.
Every 6 months to include:
• Flush entire system manually at each valve.
• Ensure each valve is working properly.
• Inspect backflow devices for leaks.
• Generate a written report for each inspection performed and submit to EDC office.
• All sprinkler heads & components of the sprinkler system will be replaced with original parts.
• Contractor must be licensed irrigator.
• No subcontractors.
Page 5 of 24