| Location: | Maryland |
|---|---|
| Posted: | Jul 10, 2025 |
| Due: | Aug 5, 2025 |
| Agency: | Cecil County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Washington Street Pump Station Valve Replacement
Addenda: 0
Release Date: 7/10/2025
Due Date: 8/5/2025
The Washington Street Sewage Pumping Station has four pumping trains.
Each train has one (1) inlet, one (1) check and one (1) discharge valve for a total of twelve (12) valves.
The valves do not close properly so individual trains cannot be taken off line for maintenance, etc.
The County is seeking to purchase twelve (12) valves, no installation of valves is required at this time.
Asbuilt drawings for the pumping station are provided in this request

With GovernmentContracts, you can:
...of existing pumps, grinder, auger, electrical disconnects, transfer switch, and controls; installation of ...
JUSTICE, DEPARTMENT OF
Bid Due: 7/30/2026
...lift station. Work includes demolition and removal of existing pumps, grinder, auger, electrical... ...
JUSTICE, DEPARTMENT OF
Bid Due: 8/13/2026
...AMC Sub Command ACC Sub Command 2 MISSION INSTALLATION CONTRACTING COMMAND Sub Command ...
DEPT OF DEFENSE
Bid Due: 7/29/2026
...be able to meet the following minimum specifications and include installation, training, and ...
COMMERCE, DEPARTMENT OF
Bid Due: 8/03/2026