| Location: | Connecticut |
|---|---|
| Posted: | May 29, 2026 |
| Due: | Jun 11, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 37150 |
| Publication URL: | To access bid details, please log in. |
Tirrell Building Cafeteria Upgrade: Cafeteria Furniture
The Norwich Free Academy Cafeteria Upgrade Project includes the delivery, assembly, and installation of cafeteria furniture identified in Exhibit B. The awarded vendor shall coordinate all delivery and installation activities to meet the project schedule. All furniture deliveries shall occur on August 20, 2026, unless otherwise approved in writing by NFA. Furniture shall be installed in the locations shown in Exhibit B. If construction conditions prevent installation in designated areas, NFA will identify alternate locations within the cafeteria for temporary placement or installation. Vendors will not be compensated for storage of materials prior to the scheduled delivery date, and early deliveries will not be accepted without written authorization. Elevator access is available from grade level to the cafeteria; however, vendors are responsible for transporting oversized items down one flight of stairs if necessary. Vendors shall remove all packaging and debris upon completion.
Nathan Quesnel 305 Broadway Norwich CT, 06360 United States Tel: 8604255500 Fax: quesneln@nfaschool.org

With GovernmentContracts, you can:
...; exposed aggregate concrete sidewalks; concrete stairs, stone stairs on concrete; dry laid ...
State Government of Connecticut
Bid Due: 10/02/2026
...square feet concrete patio connected to the building and parking area via a ...
State Government of Connecticut
Bid Due: 9/22/2026
...concrete patio connected to the building and parking area via a new accessible ...
City of Norwalk
Bid Due: 9/22/2026
...accessible stair, ramp and walkways. The project is partially funded in part through ...
City of Norwalk
Bid Due: 9/22/2026