| Location: | Texas |
|---|---|
| Posted: | Mar 31, 2025 |
| Due: | Apr 30, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 0004520 |
| Publication URL: | To access bid details, please log in. |
0004520
Posted
Omar Casas
(512) 463-1861
omar.casas@tfc.texas.gov
4/30/2025
3:00 PM
303
21+ Days for Solicitation Notice
3/31/2025
3/31/2025 3:21 pm
15570-Portable Toilets;
33055-Fencing, Temporary (For Construction And Other Industrial Or Safety Uses);
45072-Scaffolding, Sectional (Including Work Platforms);
90976-Site Work;
91438-Electrical;
96239-Hauling Services;
97108-Building, Fabricated, Pre;
97763-Scaffolding And Ladders Rental Or Lease;
1) SCOPE : In accordance with theprovisions of Texas Government Code, Chapter ยง2269 Subchapter D, CompetitiveSealed Proposal Method, and Rules and Procedures adopted by the TexasFacilities Commission (TFC), TFC is soliciting proposals for TFC State SurplusStore Electrical Modifications, Project 24-055-4201, located at 6506 Bolm Roadin Austin, TX. The project scope consists of demolishing existing low voltagepanels in the building and replacing them with new panels as shown on plans.The distribution feeders from the main distribution panel to the low voltagepanels will be removed and replaced with new in existing conduit. All workassociated with the demolition and installation of the panels will fall underthe scope of the Contractor. Installation of a new main switchboard with connectionsfor the existing solar panels will need to be installed by the Contractor. TheContractor must coordinate with The Utility Company on any shutdowns andreconnection of the existing solar equipment. The Contractor must also coordinatethe shutdown with the Owner. A manual transfer switch with an integrateddocking station is to be installed by the Contractor.
2) ESTIMATED BUDGET : The estimatedconstruction budget for the services described in the Request for Proposal(RFP) is Four Hundred Thousand Dollars ($375,000.00).
3) CONTRACT TERM : Construction isrequired to commence at 6:00PM on 08/22/2025 through 6PM 08/31/2025 forshutdown and installation.
1) SCHEDULE OF EVENTS : TFCreserves the right to change the dates shown below upon written notification.
|
EVENT |
DATE |
|
Issue RFQ |
03/31/2025 |
|
Mandatory Pre-Submittal conferences On Site 1 st PSC 2 nd PSC |
04/11/2025, 1:00 PM, Friday 04/14/2025, 1:00 PM, Monday |
|
Deadline for Submission of Questions |
04/22/2025 |
|
Deadline for Submission of Proposals and HSP |
04/30/2025, 3:00 PM |
|
Notification of Interview Selection |
05/07/2025 |
|
Interviews |
05/15/2025 |
2) MANDATORY PRE-PROPOSAL CONFERENCES : Mandatorypre-submittal conferences will be held on Friday, April 11 th , 2025,at 1:00 PM and Monday, April 14 th , 2025, at 1:00 PM. The conferenceswill be held at 6506 Bolm Road in Austin, TX. Meet at the front of the Store. Respondents must have an employee of theirfirm attend at least one (1) of the two (2) pre-submittal conferences. TFCshall reject qualifications submitted by firms that did not attend one of themandatory pre-submittal conferences.
3) SITE VISIT : Willimmediately follow the Proposal Conferences.
Project Drawing available on Bonfire.

With GovernmentContracts, you can:
...Automatic Transfer Switch Installation at the Rio Grande State Center Solicitation ID...
State Government of Texas
Bid Due: 6/12/2026
...diesel engine generator including electrical connections, automatic transfer switch, elevated...
County of Calhoun
Bid Due: 7/14/2026
...generator with a base fuel tank, along with a Service entrance rated Automatic ...
City of Sugar Land
Bid Due: 6/04/2026
...a warranty of at least 5 years for Generator and Automatic Transfer Switch. ...
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Bid Due: 7/21/2026