| Location: | Utah |
|---|---|
| Posted: | Sep 8, 2026 |
| Due: | Sep 23, 2026 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF27B000005 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT NUMBER: UT NP ARCH 100(2)
PROJECT NAME: Bridges on Delicate Arch Road
PROJECT DESCRIPTION:
Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to
Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily
traveled by visitors and often congested during periods with moderate-to-high levels of
visitation.
DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and
Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe
Ranch. Culverts installed during original road construction in the mid-1990s and during
subsequent upgrades are inadequate to allow unobstructed stream flow and sediment
transport downstream. This existing condition produces flooding and sediment
deposition, which creates unsafe conditions for visitors, triggers road closures, potentially
strands Park visitors, diminishes visitor experience of the Park, and generates high
operational costs associated with traffic management, visitor safety, and cleanup
operations.
SCOPE OF THE WORK:
This project will be designated as Reconstruction (4R) with one segment of restoration
(3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash,
Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised
to accommodate a 10-year design frequency and allow a medium-sized excavator to
access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway
and new bridge location to the north of the existing roadway and drainage crossing. The
remaining 3R sections of the roadway will receive full depth reclamation (FDR) or
removal of pavement, including all parking areas, followed by a 4-inch pavement
overlay.
PRINCIPAL WORK ITEMS:
ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award – November 2026
NTP – December 2026
Contract Completion – December 2028
ESTIMATED COST RANGE:
Total estimated cost between $10,000,000 and $20,000,000
This will be solicited as a full and open competition.

With GovernmentContracts, you can:
...Utah's transportation system. It is anticipated that this RFP will result in a ...
State Government of Utah
Bid Due: 9/25/2026
...Contractor to provide all professional design, project management, labor, supervision, materials..., equipment, transportation, ...
State Government of Utah
Bid Due: 9/25/2026
...of the transportation system. The Zero Fatalities PR and Media team will also ...
State Government of Utah
Bid Due: 10/05/2026