| Location: | California |
|---|---|
| Posted: | Aug 28, 2025 |
| Due: | Oct 7, 2025 |
| Agency: | Los Angeles County Sanitation Districts |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | JO-P-0508 |
| Publication URL: | To access bid details, please log in. |
Dollar Range: Approx. $7,260,000 to $10,890,000
Contact
Rosann Paracuelles Ext. 1614
Email: rparacuelles@lacsd.org
Advertise: 8/21/2025 and 8/28/2025
Walk-Through: Video (Mandatory)
Bid: 10/07/2025 @ 2:00 P.M.
Award: 11/12/2025
Working Days: 280
Obtain and download electronic Bid Documents, Plan Holders List, and Project Bid Results on Quest Construction Data Network (QuestCDN) .
The project will rehabilitate approximately 15,032 feet of existing 33- and 39-inch diameter reinforced concrete pipe (RCP) on the Joint Outfall D Unit 6 and Joint Outfall D Unit 6 Relief Trunk Sewer with cured-in-place pipe liners (CIPP) and approximately forty-eight (48) adjacent manholes and structures with a protective coating system and all appurtenant work.

With GovernmentContracts, you can:
..., and Technical Services 238110: Poured Concrete Foundation and Structure Contractors Construction... 238120: ...
City of Los Angeles
Bid Due: 10/14/2026
...and Civil Engineering Construction Construction 238110: Poured Concrete Foundation and Structure Contractors Construction ...
City of Los Angeles
Bid Due: 9/23/2026
...Construction 238110: Poured Concrete Foundation and Structure Contractors Construction 238120... Industry 237110: Water ...
City of Los Angeles
Bid Due: 9/23/2026
...Structures Construction Construction 237990: Other Heavy and Civil Engineering Construction Construction Sub... and ...
City of Los Angeles
Bid Due: 10/28/2026