| Location: | Oklahoma |
|---|---|
| Posted: | Jun 25, 2026 |
| Due: | Jul 23, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA813226Q0029 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
AMENDMENT 04 (2026 Jun 25) -- the following changes and updates have been made:
1. Q and A (2026 Jun 22) is attached.
2. Combined Synopsis/Solicitation (CSS; the main solicitation document) has been updated --
a. There are two evaluation factors: Technical Acceptability [pass/fail] and lowest total price.
b. Offer Due Date is Thursday, July 23rd, 2026 (Noon CDT).
c. RFO reference links are updated.
d. Technical Approach documentation is limited to 100 pages (Word, Excel, and PDF only).
e. Late quotes will NOT be accepted.
f. Contractor Responsibility has been spelled out.
g. Technical Acceptability information provided.
h. All references to RFO FAR have been updated to RFO.
i. Misc. para. numbering and PZIMC's location has been updated.
3. Quote Sheet (2026 Jun 25) - a storage CLIN has been added.
REMINDERS:
The successful offeror will be responsible for EVERYTHING spelled out in the SOW. The successful offeror will be the supplier, installer, integrator, and trainer for this requirement. Failure to quote on just one item we need will render you ineligible for award.
--------------------------------------------------------------------------
--------------------------------------------------------------------------
AMENDMENT 03 (2026 May 14/1430 hrs) -- three changes have been made, and they are as follows:
1. Pictures and a Drawing - redacted/vetted pictures and one drawing have been uploaded for your use.
2. Q&A Period - all questions are due to us no later than 9:00 AM CDT on Thursday, May 21st, 2026 .
3. Offer Due Date - a new, final offer due date will be established after all questions are answered have been posted.
--------------------------------------------------------------------------
--------------------------------------------------------------------------
AMENDMENT 02 (2026 May 06/1100 hrs) - the Statement of Work has been updated. Please read it carefully.
REMINDER: this is an all-or-nothing RFQ. We are not accepting offers for a piece or just pieces of this system. Your offer will not be considered unless it is for the entire system, to include ALL SITE WORK IAW the SOW.
--------------------------------------------------------------------------
--------------------------------------------------------------------------
QUESTIONS AND ANSWERS (Q&A; 2026 Apr 30) - vendor-submitted Q&A have been posted on this date.
--------------------------------------------------------------------------
--------------------------------------------------------------------------
AMENDMENT 01 (2026 Apr 20/1030 hrs) - site visit date and time have changed, to include due date for site visit confirmation. Offer due date has changed. See the solicitation document pages 1 and 2 - named FA813226Q0029 Amd 01 - Next Gen High Pressure Cold Spray System 2026 04 20 - for changes, all of which are highlighted in blue.
--------------------------------------------------------------------------
*** NOTE FOR POTENTIAL OFFERORS [2026 04 20 0906 hrs] -- this is an all-or-nothing RFQ. We are not accepting offers for a piece or just pieces of this system. Your offer will not be considered unless it is for the entire system, to include ALL SITE WORK IAW the SOW.
--------------------------------------------------------------------------
--------------------------------------------------------------------------
NEXT GEN HIGH PRESSURE COLD SPRAY SYSTEM: consisting of the following equipment -
- Impact Innovation EvoCSII Cold Spray Machine – [BRAND NAME] configured for Helium & Nitrogen Carrier Gas and Mutli-Gas Sprays; equipped with nozzle cooling, powder feeder station configured for 2 powder feeders, and 2 powder feeders; EvoCSII 6/11 AH Cold Spray Gun; includes all additional tools listed in Appendix A of the Statement of Work (SOW). See SOW for machine details.
- Fanuc M-710iC/50 Industrial Robot – [BRAND NAME] delivered with all options listed in the SOW.
- Nitrogen Supply System – capacity sufficient to meet gas consumption on 4-6 week refill schedule; compressor sized to produce 3600psig; gas provided at 99.999% purity; configured for outdoor service; configured with capacity telemetry to schedule delivery; foundation assessment (new foundation, if required); see SOW for details.
- Argon Fire Suppression System – meets requirements set in NFPA 484 and NFPA 2001. See SOW for details.
- HiWatch HR2 Particle Measurement System – [BRAND NAME] with sensor. See SOW for details.
- ReliaCoat In-Situ Coating Property (ICP-8) Sensor – [BRAND NAME] see SOW for details.
- Dust Handler/Collector – with spark arrester and blast venting. See SOW for details.
- High-Pressure Gas Plumbing – see SOW for details.
- Ancillary Equipment – all additional items and components included as listed in SOW
- System Integration – as outlined in SOW.
- Installation – see SOW for details.
- Training – see SOW for details.
All details are listed in the Statement of Work (SOW).
This is a Brand Name Requirement for four of the system components IAW RFO FAR Subpart 11.204 and the authority found at RFO FAR 12.201-1, Simplified Procedures (41 USC 1901). We are requesting quotes for the exact item(s) found in the Quote Sheet and the attachments. Please see Quote Sheet and the attachments for complete details.
Substitute/Equal items are not permitted in quotes for this solicitation. Quotes with Substitute/Equal items will not be eligible for award.
| Apr 14, 2026 | [Combined Synopsis/Solicitation (Original)] Next Gen High Pressure Cold Spray System |
| Apr 20, 2026 | [Combined Synopsis/Solicitation (Updated)] Next Gen High Pressure Cold Spray System |
| Apr 30, 2026 | [Combined Synopsis/Solicitation (Updated)] Next Gen High Pressure Cold Spray System |
| May 6, 2026 | [Combined Synopsis/Solicitation (Updated)] Next Gen High Pressure Cold Spray System |
| May 14, 2026 | [Combined Synopsis/Solicitation (Updated)] Next Gen High Pressure Cold Spray System |
| Jun 12, 2026 | [Combined Synopsis/Solicitation (Updated)] Next Gen High Pressure Cold Spray System |
| Jul 16, 2026 | [Combined Synopsis/Solicitation (Updated)] Next Gen High Pressure Cold Spray System |

With GovernmentContracts, you can:
...OF THE AIR FORCE Major Command AIR EDUCATION AND TRAINING COMMAND Office FA3029 ...
DEPT OF DEFENSE
Bid Due: 8/05/2026
...AIR EDUCATION AND TRAINING COMMAND Office FA3029 71 FTW CVC Looking for contract ...
DEPT OF DEFENSE
Bid Due: 8/27/2026
...EDUCATION AND TRAINING COMMAND Office FA4419 97 CONF CC Looking for contract opportunity ...
DEPT OF DEFENSE
Bid Due: 7/30/2026
...areas. Thus, all contractor personnel will be required to receive FOD awareness training ...
DEPT OF DEFENSE
Bid Due: 7/27/2026