| Location: | Pennsylvania |
|---|---|
| Posted: | May 6, 2026 |
| Due: | Jun 3, 2026 |
| Agency: | PennBid |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Horsham Township, Montgomery County, PA |
| Publication URL: | To access bid details, please log in. |
Project Description: The Work to be completed under this contract consists of all labor, equipment, and materials to remove the existing bridge and replacing it with a new structure. The scope of work includes, but is not limited to the installation of detour signs and barricades, clearing and grubbing, stream diversion and E&S controls, temporary support of excavation, excavation, demolition, reinforcing bar installation, cast-in-place concrete work, stone placement, asphalt pavement work, installation of guide rail and site restoration.

With GovernmentContracts, you can:
...between Melwood Ave. and Bigelow Blvd. This includes excavation work, protecting existing utilities... ...
City of Pittsburgh
Bid Due: 12/30/2035
...and demolition; unclassified bulk excavation and fine grading; erosion and sediment control measures; ...
PennBid
Bid Due: 10/22/2026
...stormwater conveyance piping, trench excavation and trench preparation for new stormwater conveyance...
PennBid
Bid Due: 10/01/2026
...services include, but are not limited to: water, soil, and waste sampling; excavation ...
State Government of Pennsylvania
Bid Due: 12/31/2099