| Location: | North Carolina |
|---|---|
| Posted: | Oct 31, 2024 |
| Due: | Dec 5, 2024 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 83-CFCC-83-2024-10311 |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 83-CFCC-83-2024-10311 |
| Project Title: | HVAC Renovation Phase 3 – McLeod Building/Bldg S – Downtown Campus |
| Description: | Cape Fear Community College is seeking proposals from qualified Design Build HVAC teams to design and construct major HVAC Renovations for this building, located at CFCC’s Wilmington NC Campus. The Existing building is 7 floors, 114,000sf. Desired scope is replacement of VAV’s, hot water coils and control dampers on existing dual deck or multizone HVAC system on two floors of the building. Work to include DDC controls, hot water piping from building riser to VAV’s, grilles, outside air dampers and actuators, fire dampers and other required accessories. Upgrade air handlers from starters to VFD’s. Associated removal and replacement of ceiling grid and tile. One firm will be selected for the entire project. DISADVANTAGED BUSINESS ENTERPRISES AND HISTORICALLY UNDERUTILIZED BUSINESSES ARE ENCOURAGED TO APPLY FOR PREQUALIFICATION EITHER INDEPENDENTLY OR AS PART OF A TEAMING ARRANGEMENT. |
| Opening Date: | 12/5/2024 3:00 PM |
| Posted Date: | 11/1/2024 |
| Status: | Open |
| Department: | CAPE FEAR COMMUNITY COLLEGE |
|
Solicitation Number
*
83-CFCC-83-2024-10311
|
Department
CAPE FEAR COMMUNITY COLLEGE
|
Status Reason
Open
|
|
|
Opening Date
2024-12-05T15:00:00.0000000
|
Posted Date
*
2024-10-31T18:21:09.0000000Z
|
Commodity Code
Heating and cooling and air conditioning HVAC construction and maintenance services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
||
|
Description
Cape Fear Community College is seeking proposals from qualified Design Build HVAC teams to design and construct major HVAC Renovations for this building, located at CFCC’s Wilmington NC Campus. The Existing building is 7 floors, 114,000sf. Desired scope is replacement of VAV’s, hot water coils and control dampers on existing dual deck or multizone HVAC system on two floors of the building. Work to include DDC controls, hot water piping from building riser to VAV’s, grilles, outside air dampers and actuators, fire dampers and other required accessories. Upgrade air handlers from starters to VFD’s. Associated removal and replacement of ceiling grid and tile. One firm will be selected for the entire project. DISADVANTAGED BUSINESS ENTERPRISES AND HISTORICALLY UNDERUTILIZED BUSINESSES ARE ENCOURAGED TO APPLY FOR PREQUALIFICATION EITHER INDEPENDENTLY OR AS PART OF A TEAMING ARRANGEMENT.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can: