| Location: | Georgia |
|---|---|
| Posted: | Oct 28, 2026 |
| Due: | Oct 30, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA8501-27-RAPID-PAVE-OTA |
| Publication URL: | To access bid details, please log in. |
The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID Robins Agile Practices for Infrastructure Development at Robins AFB) umbrella framework and pursuant to 10 U.S.C. § 2808a.
The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to restore, modernize, and sustain critical airfield infrastructure at Robins Air Force Base. The requirement includes airfield pavement, runway-overrun, taxiway, drainage, pavement marking, and associated supporting work necessary to improve safe, reliable, and mission-ready aircraft operations.
This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a.
Purpose
The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to restore and sustain airfield infrastructure supporting safe aircraft movement, installation readiness, and continued mission operations at Robins Air Force Base, Georgia.
The Government requires an integrated approach to address deteriorated pavement, runway overrun, taxiway, drainage, storm-drain-disposal, pavement-marking, and related airfield infrastructure conditions. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks.
Project Background and Existing Conditions
The current runway and taxiway infrastructure exhibit deterioration, including cracking, displacement, rutting, and other pavement deficiencies that affect long-term serviceability and air-field-operational reliability.
Drainage infrastructure near the south end of the runway is overgrown and requires adjustment or corrective work to improve drainage performance and reduce the risk of continued pavement or operational impacts.
The work area is congested and affected by ongoing airfield operations, access restrictions, construction staging limitations, and mission requirements. The runway and taxiway may remain in full or partial operation depending on the approved phase of work.
Project Areas
The Government requires a solution to address deficiencies associated with Runway 3901 pavement slabs, shoulders, pavement condition, and associated maintenance and marking requirements. The desired end state is a safe, serviceable runway with restored pavement integrity, shoulders, markings, and supporting features necessary for continued airfield operations.
The Government requires a solution to replace or restore the south runway overrun and associated infrastructure necessary to support safe runway operations. Respondents shall address proposed sequencing, access, staging, safety controls, airfield coordination, and methods for reducing operational disruption.
The Government may include additional south-overrun work as a contingent requirement. Respondents shall identify assumptions, cost and schedule impacts, technical dependencies, and proposed activation conditions associated with any contingent work. The Government will determine whether this work is included in the final OTA scope, separately negotiated, or otherwise addressed during Phase 3.
The Government requires a solution to repair Taxiway C, Facility 3931, and restore safe, reliable aircraft ground-movement capability. The proposed approach should address pavement condition, phasing, aircraft-operational coordination, quality control, inspection, testing, and turnover requirements.
The Government requires a solution to correct drainage and storm-drain-disposal deficiencies at Facility 8700. The proposed approach should address existing drainage conditions, water management, constructability, site access, protection of adjacent infrastructure, environmental controls, and integration with related pavement and airfield work.
OTA & RAPID Framework Approach
This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Build-Only execution approach under the standalone statutory authority of 10 U.S.C. § 2808a. Because the Government has provided a 100% completed design package and/or specific phasing and repair requirements, this project does not contain a collaborative design-builder phase. Instead, it transitions directly to rapid construction execution under an OTA structure to bypass administrative procurement lag.
Competitive Selection Process
Phase 1 Solution Brief Requirements
The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration.
Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement.
Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 30 October 2026.
Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page via email to the designated point of contact listed.
The Solution Brief shall include:
Evaluation & Selection Criteria
The Government will utilize a two-step, Best-Value selection process mapped to the RAPID framework to select the Company. The evaluation process consists of:
Step 1: RAPID Phase 1 Equivalent
Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1.
Step 2: RAPID Phases 2 & 3 Equivalent
Interactive Pitch Presentations/Interviews and evaluation of the Price Proposal (short-listed teams only) to determine the final best-value selection.
Step 1: Statement of Qualifications Evaluation Factors
Factor 1: Past Relevant Construction Experience
Factor 2: Team Composition and Organization
Factor 3: Construction Execution and Phasing Approach
Step 2: Pitch Presentation and Price Evaluation (Final Down-Select)
The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day.
Short-listed firms will be invited to an interactive Pitch Presentation and must submit a formal Price Proposal. Final selection will be based on a best-value tradeoff between the technical presentation factors and price:
Factor 1: Constructability Review and Risk Management (Presentation)
Factor 2: Collaborative Execution and Problem-Solving (Presentation/Q&A)
Factor 3: Financial Capacity and Bonding
Final Selection and Award
The Government will make a final best-value down-select decision. The Company to be awarded is the company’s whose combined technical qualifications, execution pitch, and price proposal represent the most advantageous offer to the Government.
The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA.
Government Reservations
The Government reserves the right to:
Attachments
| Oct 21, 2026 | [Special Notice (Original)] FA8501-27-RAPID-PAVE-OTA |
| Oct 27, 2026 | [Special Notice (Updated)] FA8501-27-RAPID-PAVE-OTA |

With GovernmentContracts, you can:
Follow Washer/Dryer Lease and Maintenance, Naval Submarine Base (NSB), Kings Bay, GA Active
DEPT OF DEFENSE
Bid Due: 11/06/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-70662-NONST-2027-000000131
State Government of Georgia
Bid Due: 11/18/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66300-NONST-2027-000000130
State Government of Georgia
Bid Due: 11/12/2026
Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66789-NONST-2027-000000022
State Government of Georgia
Bid Due: 11/16/2026