CWA2406/2409: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM

Location: Texas
Posted: May 6, 2026
Due: Jun 4, 2026
Agency: City of Sugar Land
Type of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Solicitation No: 2026-ITB-022
Publication URL: To access bid details, please log in.


Project ID: 2026-ITB-022

Title: CWA2406/2409: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM

Addenda: 0

Release Date: 5/6/2026

Due Date: 6/4/2026

Follow
CWA2406/2409: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM
Invitation For Bid
Engineering
90900 , 91000 , 91200 , 91300 , 91400 ... show all
Project ID: 2026-ITB-022
Release Date: Wednesday, May 6, 2026
· Due Date: Thursday, June 4, 2026 11:00am
Posted Wednesday, May 6, 2026 6:38am
All dates & times in Central Time
Draft Response Events RSVP No Bid28 days, 14 hours, 31 minutes


Post Information

Posted At:Wed, May 6, 2026 6:38 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

BRIEF SCOPE OF WORK

Major Improvements:

Sugar Creek Water Plant:

For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor shall also furnish and install a new incoming service bus weatherhead per CenterPoint Energy Standards, including all required supports, fittings, terminations, and weatherproofing/sealing, and shall coordinate any and all required outage and service reconnection to provide a complete, code-compliant service entrance installation. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. PLC/SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls).

First Colony Water Plant:

For First Colony Water Plant, the scope of work includes the rehabilitation of the existing Automatic Transfer Switch (ATS) and the installation of a new diesel generator, sub-base fuel tank, along with a proposed dual-purpose docking station. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls).

Miscellaneous Improvements:

The miscellaneous improvements include the following items:

  • Installation of New Diesel Fuel Management Systems
  • Rust Prevention, Painting, and Protective Coatings
  • Repairs to existing Fuel Storage Tanks

Before commencing any miscellaneous improvement tasks, a site visit should be conducted at each facility to verify the scope of work. Existing conditions may differ from those when the project scope was initially developed. This visit will be coordinated with the Owner's designated representative to assess the site and confirm the feasibility of the proposed improvements. The objectives of the site visit include:

  • Verifying the physical space and layout.
  • Ensuring all necessary infrastructure and utilities are available.
  • Identifying potential challenges that may arise during installation.
  • Discussing any required modifications or special considerations for the initial design or installation plan.

The water facilities where the proposed miscellaneous improvements should be implemented are summarized below.

S. No

Water Facility

Address

Surface Water Plant

14601 Voss Road, Sugar Land, TX 77498

Woodchester

13743 Woodchester, Sugar Land, TX 77498

Lakeview

1101 Lakeview Drive, Sugar Land, TX 77478

Sugar Creek Water Well Pump Right Angle Drive

2030 Country Club Blvd, Sugar Land, TX 77478

Austin Parkway

1402 Austin Parkway, Sugar Land, TX 77479

Riverstone

16802 1/2 University Blvd., Sugar Land, TX 77479

Riverpark

5975 Summit Creek, Sugar Land, TX 77479

Greatwood East

8915 Park River Dr., Sugar Land, TX 77479

Greatwood West

6631 Greatwood Pkwy, Sugar Land, TX 77479

New Territory Blvd

4421 ½ New Territory Blvd., Sugar Land, TX 77479

Homeward Way

5505 Homeward Way, Sugar Land, TX 77479

Thompson Chapel

4603 Thompson Chapel, Sugar Land, TX 77479

  1. Base Bid Items:
    1. Sugar Creek Water Plant.
  2. Alternative Bid Items:
    1. First Colony Water Plant.
    2. New Diesel Fuel Management System.
    3. Rust Prevention, Painting, and Protective Coatings.

Note: Alternate bids may be considered depending on the availability of City funds. The City reserves the right to include any or all alternative bid items in its bid evaluation.



Timeline

Advertised in local paper/Notice Posted to OpenGov Procurement:
May 6, 2026
Pre-Bid Conference (Non-Mandatory):
May 14, 2026, 11:00am
Meeting ID:
242 524 858 363 712

Passcode:
ie7zj7Zx
Site Visit (Non-Mandatory):
May 18, 2026, 9:00am
Start at First Colony Water Plant
Questions Deadline:
May 21, 2026, 5:00pm
Questions Answered and Addendum posted:
May 28, 2026, 5:00pm
Bids Due:
June 4, 2026, 11:00am
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Project: Program Management for Lake 7 Supply Project Ref. #: RFQ 26-19708-TF Type: ...

City of Lubbock

Bid Due: 6/18/2026

...Project: ITB - Waste Management Services Ref. #: 26/0030 Type: ITB Status: Open ...

Harris County

Bid Due: 6/15/2026

...Project: RFP - Agenda and Meeting Management System for Harris County Ref. #: ...

Harris County

Bid Due: 6/22/2026

...Project: RFP - Election Management System for Harris County Clerk's Office Ref. #: ...

Harris County

Bid Due: 6/22/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.