Project ID: 2026-ITB-022
Title: CWA2406/2409: GROUNDWATER PLANT GENERATOR & RIGHT ANGLE DRIVE (RAD) MAINTENANCE PROGRAM
Addenda: 0
Release Date: 5/6/2026
Due Date: 6/4/2026
BRIEF SCOPE OF WORK
Major Improvements:
Sugar Creek Water Plant:
For Sugar Creek Water Plant, the scope of work includes the installation of a new diesel generator with a base fuel tank, along with a Service entrance rated Automatic Transfer Switch (ATS) and a dual-purpose docking station. The contractor shall also furnish and install a new incoming service bus weatherhead per CenterPoint Energy Standards, including all required supports, fittings, terminations, and weatherproofing/sealing, and shall coordinate any and all required outage and service reconnection to provide a complete, code-compliant service entrance installation. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. PLC/SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls).
First Colony Water Plant:
For First Colony Water Plant, the scope of work includes the rehabilitation of the existing Automatic Transfer Switch (ATS) and the installation of a new diesel generator, sub-base fuel tank, along with a proposed dual-purpose docking station. The contractor will be responsible for preparing the site, which includes constructing new concrete foundations, slabs, platforms, grating, and handrails as required. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. The contractor will handle the removal of any existing equipment and the demolition of old concrete pads. Once the new equipment is in place, the contractor will perform final site grading to ensure the site is properly prepared and completed according to specifications. Additionally, final site grading will be performed after the completion of all installations to ensure proper leveling and drainage. The contractor will furnish all necessary labor, materials, equipment, and incidentals required to complete the work as specified. SCADA programming and modification to owner facilities will be performed by owner pre-selected SCADA integrator (Prime Controls).
Miscellaneous Improvements:
The miscellaneous improvements include the following items:
Before commencing any miscellaneous improvement tasks, a site visit should be conducted at each facility to verify the scope of work. Existing conditions may differ from those when the project scope was initially developed. This visit will be coordinated with the Owner's designated representative to assess the site and confirm the feasibility of the proposed improvements. The objectives of the site visit include:
The water facilities where the proposed miscellaneous improvements should be implemented are summarized below.
|
S. No |
Water Facility |
Address |
|
|
Surface Water Plant |
14601 Voss Road, Sugar Land, TX 77498 |
|
|
Woodchester |
13743 Woodchester, Sugar Land, TX 77498 |
|
|
Lakeview |
1101 Lakeview Drive, Sugar Land, TX 77478 |
|
|
Sugar Creek Water Well Pump Right Angle Drive |
2030 Country Club Blvd, Sugar Land, TX 77478 |
|
|
Austin Parkway |
1402 Austin Parkway, Sugar Land, TX 77479 |
|
|
Riverstone |
16802 1/2 University Blvd., Sugar Land, TX 77479 |
|
|
Riverpark |
5975 Summit Creek, Sugar Land, TX 77479 |
|
|
Greatwood East |
8915 Park River Dr., Sugar Land, TX 77479 |
|
|
Greatwood West |
6631 Greatwood Pkwy, Sugar Land, TX 77479 |
|
|
New Territory Blvd |
4421 ½ New Territory Blvd., Sugar Land, TX 77479 |
|
|
Homeward Way |
5505 Homeward Way, Sugar Land, TX 77479 |
|
|
Thompson Chapel |
4603 Thompson Chapel, Sugar Land, TX 77479 |
Note: Alternate bids may be considered depending on the availability of City funds. The City reserves the right to include any or all alternative bid items in its bid evaluation.

With GovernmentContracts, you can:
...) Return Flow Pump Station; (16) Odor control facilities; (17) Electrical Buildings and ...
City of Fort Worth
Bid Due: 6/25/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable... ...
City of Dallas
Bid Due: 7/10/2026
...residuals bypass pipeline, mechanical upgrades to the Sludge Pump Station, installation of variable... ...
City of Dallas
Bid Due: 7/10/2026
...as erosion control, restorative vegetation, and a traffic control plan. All proposals shall ...
County of Brazos
Bid Due: 6/24/2026